IAC Assessment: DL0088
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: DL0088
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Delaware
Assessment Year 2012
Principal Product Silicon and Boron Carbide Composite
NAICS 339999 - All Other Miscellaneous Manufacturing
SIC 3599 - Industrial Machinery, Nec
Sales $10,000,000-$50,000,000
# of Employees 45
Plant Area (Sq.Ft.) 60,000
Annual Production 12,000,000 Units
Production Hrs. Annual 4,380
Location (State) DE
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $908,507 11,525,766 kWh $0.08
Natural Gas $53,724 3,860 MMBtu $13.92
TOTAL ENERGY COSTS $962,231
RECOMMENDED SAVINGS* $225,943 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $145,965
#|Description Savings
Cost
Status Electricity Usage Natural Gas Electricity Usage Natural Gas
$ kWh $ MMBtu
01: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$42,739
Cost:
$100
$42,739 541,000 - - $42,739
541,000
kWh
-
-
MMBtu
02: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$50,290
Cost:
$23,500
$50,290 636,587 - - $50,290
636,587
kWh
-
-
MMBtu
03: 2.7124 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED Savings:
$19,620
Cost:
$7,000
$19,620 248,390 - - $19,620
248,390
kWh
-
-
MMBtu
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$21,488
Cost:
$34,800
$21,488 272,000 - - $21,488
272,000
kWh
-
-
MMBtu
05: 2.7221 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA Savings:
$39,912
Cost:
$100
$10,112 128,000 $29,800 2,148 $10,112
128,000
kWh
$29,800
2,148
MMBtu
06: 2.4226 USE / PURCHASE OPTIMUM SIZED COMPRESSOR Savings:
$20,935
Cost:
$24,500
$20,935 265,000 - - $20,935
265,000
kWh
-
-
MMBtu
07: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$7,749
Cost:
$100
$7,749 98,092 - - $7,749
98,092
kWh
-
-
MMBtu
08: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$15,010
Cost:
$11,800
$15,010 190,000 - - $15,010
190,000
kWh
-
-
MMBtu
09: 2.2511 INSULATE BARE EQUIPMENT Savings:
$8,200
Cost:
$1,500
$8,200 103,800 - - $8,200
103,800
kWh
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$225,943
Cost:
$103,400
$196,143 2,482,869 $29,800 2,148 $196,143
2,482,869
kWh
$29,800
2,148
MMBtu
TOTAL IMPLEMENTED Savings:
$145,965
Cost:
$43,600
$116,165 1,470,482 $29,800 2,148 $116,165
1,470,482
kWh
$29,800
2,148
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage Natural Gas Electricity Usage Natural Gas