IAC logo
IAC Assessment: DL0109
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: DL0109
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Delaware
Assessment Year 2013
Principal Product wastewater
NAICS 221320 - Sewage Treatment Facilities
SIC 4952 - Sewerage Systems
Sales $10,000,000-$50,000,000
# of Employees 50
Plant Area (Sq.Ft.) 100,000
Annual Production 4,380,000 Thousand Gallons
Production Hrs. Annual 8,760
Location (State) DE
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $728,236 8,748,600 kWh $0.08
Natural Gas $229,982 28,748 MMBtu $8.00
TOTAL ENERGY COSTS $958,218
RECOMMENDED SAVINGS* $175,736 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $175,736
#|Description Savings
Cost
Status Electricity Usage Natural Gas Electricity Usage Natural Gas
$ kWh $ MMBtu
01: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$150,360
Cost:
$266,687
$150,360 1,274,317 - - $150,360
1,274,317
kWh
-
-
MMBtu
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$8,350
Cost:
$40,356
$8,350 100,640 - - $8,350
100,640
kWh
-
-
MMBtu
03: 2.2424 USE HEAT IN FLUE GASES TO PREHEAT PRODUCTS OR MATERIALS Savings:
$15,750
Cost:
$5,800
- - $15,750 1,968 -
-
kWh
$15,750
1,968
MMBtu
04: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$1,276
Cost:
$250
$1,276 10,816 - - $1,276
10,816
kWh
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$175,736
Cost:
$313,093
$159,986 1,385,773 $15,750 1,968 $159,986
1,385,773
kWh
$15,750
1,968
MMBtu
TOTAL IMPLEMENTED Savings:
$175,736
Cost:
$313,093
$159,986 1,385,773 $15,750 1,968 $159,986
1,385,773
kWh
$15,750
1,968
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage Natural Gas Electricity Usage Natural Gas