IAC logo
IAC Assessment: DL0110
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: DL0110
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Delaware
Assessment Year 2013
Principal Product conveyors and accumulation tables
NAICS 333922 - Conveyor and Conveying Equipment Manufacturing
SIC 3535 - Conveyors And Conveying Equipment
Sales $1,000,000-$5,000,000
# of Employees 65
Plant Area (Sq.Ft.) 55,000
Annual Production 10 Units
Production Hrs. Annual 4,680
Location (State) NJ
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $76,847 660,080 kWh $0.12
Electricity Demand $16,064 2,615 kW-months/year $6.14
Fuel Oil #2 $68,179 2,578 MMBtu $26.45
TOTAL ENERGY COSTS $161,090
RECOMMENDED SAVINGS* $35,185 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $6,320
#|Description Savings
Cost
Status Electricity Usage Fuel Oil #2 Electricity Usage Fuel Oil #2
$ kWh $ MMBtu
01: 2.7491 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS Savings:
$7,313
Cost:
$39,750
- - $7,313 274 -
-
kWh
$7,313
274
MMBtu
02: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$6,320
Cost:
$260
- - $6,320 237 -
-
kWh
$6,320
237
MMBtu
03: 2.4224 UPGRADE CONTROLS ON COMPRESSORS Savings:
$10,321
Cost:
$35,000
$10,321 73,204 - - $10,321
73,204
kWh
-
-
MMBtu
04: 2.7314 REDUCE VENTILATION AIR Savings:
$4,577
Cost:
$102
- - $4,577 172 -
-
kWh
$4,577
172
MMBtu
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,720
Cost:
$24,800
$2,720 19,300 - - $2,720
19,300
kWh
-
-
MMBtu
06: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$1,991
Cost:
$152
- - $1,991 75 -
-
kWh
$1,991
75
MMBtu
07: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$1,943
Cost:
$644
$128 910 $1,815 68 $128
910
kWh
$1,815
68
MMBtu
TOTAL RECOMMENDED Savings:
$35,185
Cost:
$100,708
$13,169 93,414 $22,016 825 $13,169
93,414
kWh
$22,016
825
MMBtu
TOTAL IMPLEMENTED Savings:
$6,320
Cost:
$260
- - $6,320 237 -
-
kWh
$6,320
237
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage Fuel Oil #2 Electricity Usage Fuel Oil #2