IAC logo
IAC Assessment: DL0111
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: DL0111
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Delaware
Assessment Year 2013
Principal Product poultry feed
NAICS 311119 - Other Animal Food Manufacturing
SIC 2048 - Prepared Feeds, Nec
Sales $1,000,000-$5,000,000
# of Employees 15
Plant Area (Sq.Ft.) 100,000
Annual Production 312,000 Tons
Production Hrs. Annual 6,240
Location (State) DE
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $323,466 4,989,600 kWh $0.06
Electricity Demand $140,764 15,728 kW-months/year $8.95
Electricity Fees $19,916 - $ -
Natural Gas $351,883 43,175 MMBtu $8.15
TOTAL ENERGY COSTS $836,029
RECOMMENDED SAVINGS* $92,823 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $26,611
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas
$ kWh $ kW-months/year $ MMBtu
01: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$9,454
Cost:
$17,500
- - - - $9,454 1,160 -
-
kWh
-
-
kW-months/year
$9,454
1,160
MMBtu
02: 2.6124 ESTABLISH EQUIPMENT MAINTENANCE SCHEDULE Savings:
$5,281
Cost:
$1,500
- - - - $5,281 648 -
-
kWh
-
-
kW-months/year
$5,281
648
MMBtu
03: 2.7141 LOWER LIGHT FIXTURES IN HIGH CEILING AREAS Savings:
$8,423
Cost:
$45,640
$8,423 90,574 - - - - $8,423
90,574
kWh
-
-
kW-months/year
-
-
MMBtu
04: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$41,668
Cost:
$25,000
$41,668 447,947 - - - - $41,668
447,947
kWh
-
-
kW-months/year
-
-
MMBtu
05: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$6,667
Cost:
$13,600
$6,667 71,688 - - - - $6,667
71,688
kWh
-
-
kW-months/year
-
-
MMBtu
06: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$930
Cost:
$50
$930 9,930 - - - - $930
9,930
kWh
-
-
kW-months/year
-
-
MMBtu
07: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$20,400
Cost:
$25,000
- - $20,400 2,282 - - -
-
kWh
$20,400
2,282
kW-months/year
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$92,823
Cost:
$128,290
$57,688 620,139 $20,400 2,282 $14,735 1,808 $57,688
620,139
kWh
$20,400
2,282
kW-months/year
$14,735
1,808
MMBtu
TOTAL IMPLEMENTED Savings:
$26,611
Cost:
$26,550
$930 9,930 $20,400 2,282 $5,281 648 $930
9,930
kWh
$20,400
2,282
kW-months/year
$5,281
648
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu
Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas