Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Delaware |
---|---|
Assessment Year | 2013 |
Principal Product | Resin and Plastic Coated Fabrics |
NAICS | 325211 - Plastics Material and Resin Manufacturing |
SIC | 2295 - Coated Fabrics, Not Rubberized |
Sales | $50,000,000-$100,000,000 |
# of Employees | 50 |
Plant Area (Sq.Ft.) | 120,000 |
Annual Production | 9,999,999 Units |
Production Hrs. Annual | 5,616 |
Location (State) | NJ |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $259,705 | 2,330,800 | kWh | $0.11 |
Natural Gas | $329,288 | 36,278 | MMBtu | $9.08 |
TOTAL ENERGY COSTS | $588,993 | |||
RECOMMENDED SAVINGS* | $97,957 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $13,845 |
#|Description |
Savings Cost |
Status | Electricity Usage | Natural Gas | Electricity Usage | Natural Gas | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | MMBtu | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT |
Savings: $16,300 Cost: $10,000 |
- | - | $16,300 | 1,800 |
- - kWh |
$16,300 1,800 MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS |
Savings: $5,700 Cost: $20 |
- | - | $5,700 | 626 |
- - kWh |
$5,700 626 MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.7314 REDUCE VENTILATION AIR |
Savings: $2,320 Cost: $100 |
$2,320 | 20,910 | - | - |
$2,320 20,910 kWh |
- - MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $11,766 Cost: $11,200 |
$11,766 | 106,000 | - | - |
$11,766 106,000 kWh |
- - MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.7314 REDUCE VENTILATION AIR |
Savings: $11,206 Cost: $100 |
$1,400 | 12,600 | $9,806 | 1,080 |
$1,400 12,600 kWh |
$9,806 1,080 MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.2135 REPAIR AND ELIMINATE STEAM LEAKS |
Savings: $3,323 Cost: $4,000 |
- | - | $3,323 | 366 |
- - kWh |
$3,323 366 MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT |
Savings: $25,430 Cost: $24,500 |
$(-1,610) | (-14,500) | $27,040 | 2,978 |
$(-1,610) (-14,500) kWh |
$27,040 2,978 MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $4,226 Cost: $12,000 |
$4,226 | 38,076 | - | - |
$4,226 38,076 kWh |
- - MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $2,087 Cost: $22,969 |
$2,087 | 18,803 | - | - |
$2,087 18,803 kWh |
- - MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
10: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $6,316 Cost: $8,800 |
$6,316 | 56,900 | - | - |
$6,316 56,900 kWh |
- - MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
11: 2.7311 VENTILATION SYSTEM TO SHUT OFF WHEN ROOM IS NOT IN USE |
Savings: $1,741 Cost: $800 |
$777 | 7,000 | $964 | 105 |
$777 7,000 kWh |
$964 105 MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
12: 2.2511 INSULATE BARE EQUIPMENT |
Savings: $596 Cost: $500 |
$596 | 5,371 | - | - |
$596 5,371 kWh |
- - MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
13: 2.7243 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS |
Savings: $6,946 Cost: $5,250 |
- | - | $6,946 | 765 |
- - kWh |
$6,946 765 MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $97,957 Cost: $100,239 |
$27,878 | 251,160 | $70,079 | 7,720 | $27,878 251,160 kWh |
$70,079 7,720 MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $13,845 Cost: $16,520 |
$4,822 | 43,447 | $9,023 | 992 | $4,822 43,447 kWh |
$9,023 992 MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | MMBtu | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Natural Gas | Electricity Usage | Natural Gas |