Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Delaware |
---|---|
Assessment Year | 2014 |
Principal Product | Entertainment |
NAICS | 713210 - Casinos (except Casino Hotels) |
SIC | 7999 - Amusement And Recreation, Nec |
Sales | $100,000,000-$500,000,000 |
# of Employees | 600 |
Plant Area (Sq.Ft.) | 100,000 |
Annual Production | 0 Units |
Production Hrs. Annual | 8,760 |
Location (State) | DE |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $1,040,075 | 11,698,400 | kWh | $0.09 |
Natural Gas | $69,409 | 11,420 | MMBtu | $6.08 |
TOTAL ENERGY COSTS | $1,109,484 | |||
RECOMMENDED SAVINGS* | $300,951 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $121,206 |
#|Description |
Savings Cost |
Status | Electricity Usage | Natural Gas | Electricity Usage | Natural Gas | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | MMBtu | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $77,000 Cost: $45,150 |
$77,000 | 873,300 | - | - |
$77,000 873,300 kWh |
- - MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $14,400 Cost: $54,200 |
$14,400 | 161,700 | - | - |
$14,400 161,700 kWh |
- - MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.6231 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED |
Savings: $141,000 Cost: $181,900 |
$141,000 | 1,584,000 | - | - |
$141,000 1,584,000 kWh |
- - MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.7314 REDUCE VENTILATION AIR |
Savings: $36,400 Cost: $7,600 |
$10,800 | 114,000 | $25,600 | 4,218 |
$10,800 114,000 kWh |
$25,600 4,218 MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.6231 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED |
Savings: $11,700 Cost: $3,500 |
$4,500 | 51,200 | $7,200 | 1,185 |
$4,500 51,200 kWh |
$7,200 1,185 MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS |
Savings: $2,345 Cost: $5,000 |
$372 | 4,175 | $1,973 | 325 |
$372 4,175 kWh |
$1,973 325 MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT |
Savings: $5,806 Cost: - |
$8,270 | 87,000 | $(-2,464) | (-315) |
$8,270 87,000 kWh |
$(-2,464) (-315) MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.6231 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED |
Savings: $2,600 Cost: - |
$2,600 | 27,500 | - | - |
$2,600 27,500 kWh |
- - MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE |
Savings: $9,700 Cost: - |
$9,700 | 102,400 | - | - |
$9,700 102,400 kWh |
- - MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $300,951 Cost: $297,350 |
$268,642 | 3,005,275 | $32,309 | 5,413 | $268,642 3,005,275 kWh |
$32,309 5,413 MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $121,206 Cost: $102,850 |
$116,470 | 1,303,100 | $4,736 | 870 | $116,470 1,303,100 kWh |
$4,736 870 MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | MMBtu | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Natural Gas | Electricity Usage | Natural Gas |