IAC logo
IAC Assessment: DL0130
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: DL0130
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Delaware
Assessment Year 2014
Principal Product Wastewater treatment
NAICS 221320 - Sewage Treatment Facilities
SIC 4952 - Sewerage Systems
Sales <$500,000
# of Employees 50
Plant Area (Sq.Ft.) 20,000
Annual Production 850,000 Thousand Gallons
Production Hrs. Annual 8,760
Location (State) DE
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $465,906 4,695,356 kWh $0.10
TOTAL ENERGY COSTS $465,906
RECOMMENDED SAVINGS* $70,289 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $61,289
#|Description Savings
Cost
Status Electricity Usage Electricity Usage
$ kWh
01: 2.6212 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME Savings:
$9,000
Cost:
$1,000
$9,000 90,600 $9,000
90,600
kWh
02: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$54,689
Cost:
$88,625
$54,689 552,411 $54,689
552,411
kWh
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$800
Cost:
$200
$800 8,100 $800
8,100
kWh
04: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$2,400
Cost:
$800
$2,400 24,500 $2,400
24,500
kWh
05: 2.7141 LOWER LIGHT FIXTURES IN HIGH CEILING AREAS Savings:
$3,400
Cost:
$8,400
$3,400 34,700 $3,400
34,700
kWh
TOTAL RECOMMENDED Savings:
$70,289
Cost:
$99,025
$70,289 710,311 $70,289
710,311
kWh
TOTAL IMPLEMENTED Savings:
$61,289
Cost:
$98,025
$61,289 619,711 $61,289
619,711
kWh
Savings
Cost
$ kWh
Electricity Usage Electricity Usage