IAC logo
IAC Assessment: DL0154
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: DL0154
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Delaware
Assessment Year 2015
Principal Product Machined Parts
NAICS 332721 - Precision Turned Product Manufacturing
SIC 3451 - Screw Machine Products
Sales $10,000,000-$50,000,000
# of Employees 40
Plant Area (Sq.Ft.) 37,000
Annual Production 2,200,000 Pieces
Production Hrs. Annual 5,195
Location (State) PA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $73,209 796,320 kWh $0.09
Electricity Demand $11,547 2,248 kW-months/year $5.14
Electricity Fees $1,254 - $ -
LPG $6,465 312 MMBtu $20.72
TOTAL ENERGY COSTS $92,475
RECOMMENDED SAVINGS* $35,755 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $7,925
#|Description Savings
Cost
Status Electricity Usage Electricity Demand LPG Electricity Usage Electricity Demand LPG
$ kWh $ kW-months/year $ MMBtu
01: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$1,950
Cost:
$2,280
- - - - $1,950 94 -
-
kWh
-
-
kW-months/year
$1,950
94
MMBtu
02: 2.4227 USE COMPRESSOR AIR FILTERS Savings:
$1,390
Cost:
$2,190
$1,250 13,540 $140 28 - - $1,250
13,540
kWh
$140
28
kW-months/year
-
-
MMBtu
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$7,250
Cost:
$17,060
$6,380 69,380 $870 170 - - $6,380
69,380
kWh
$870
170
kW-months/year
-
-
MMBtu
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$700
Cost:
$2,210
$700 7,625 - - - - $700
7,625
kWh
-
-
kW-months/year
-
-
MMBtu
05: 2.7232 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL Savings:
$1,565
Cost:
$7,125
$1,390 15,060 $175 34 - - $1,390
15,060
kWh
$175
34
kW-months/year
-
-
MMBtu
06: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$4,585
Cost:
$32,700
$4,115 44,720 $470 91 - - $4,115
44,720
kWh
$470
91
kW-months/year
-
-
MMBtu
07: 2.9114 USE SOLAR HEAT TO MAKE ELECTRICTY Savings:
$18,315
Cost:
$226,000
$18,315 199,075 - - - - $18,315
199,075
kWh
-
-
kW-months/year
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$35,755
Cost:
$289,565
$32,150 349,400 $1,655 323 $1,950 94 $32,150
349,400
kWh
$1,655
323
kW-months/year
$1,950
94
MMBtu
TOTAL IMPLEMENTED Savings:
$7,925
Cost:
$37,170
$5,365 58,260 $610 119 $1,950 94 $5,365
58,260
kWh
$610
119
kW-months/year
$1,950
94
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu
Electricity Usage Electricity Demand LPG Electricity Usage Electricity Demand LPG