IAC logo
IAC Assessment: DL0158
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: DL0158
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Delaware
Assessment Year 2016
Principal Product Pharmaceuticals
NAICS 325412 - Pharmaceutical Preparation Manufacturing
SIC 2834 - Pharmaceutical Preparations
Sales <$500,000
# of Employees 260
Plant Area (Sq.Ft.) 570,000
Annual Production 0 Units
Production Hrs. Annual 5,000
Location (State) DE
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $1,395,119 21,915,639 kWh $0.06
Electricity Demand $556,698 49,574 kW-months/year $11.23
Electricity Fees $685 - $ -
Natural Gas $661,508 115,823 MMBtu $5.71
TOTAL ENERGY COSTS $2,614,010
RECOMMENDED SAVINGS* $591,117 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $481,517
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Administrative Changes Electricity Usage Electricity Demand Natural Gas Administrative Changes
$ kWh $ kW-months/year $ MMBtu $ $
01: 2.4224 UPGRADE CONTROLS ON COMPRESSORS Savings:
$1,270
Cost:
$60
$1,270 19,868 - - - - - - $1,270
19,868
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
02: 2.7314 REDUCE VENTILATION AIR Savings:
$310,823
Cost:
$38,750
$75,023 1,172,244 - - $235,800 41,296 - - $75,023
1,172,244
kWh
-
-
kW-months/year
$235,800
41,296
MMBtu
-
-
$
03: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$7,940
Cost:
$1,480
- - - - $7,940 1,390 - - -
-
kWh
-
-
kW-months/year
$7,940
1,390
MMBtu
-
-
$
04: 2.4321 UPGRADE OBSOLETE EQUIPMENT Savings:
$13,830
Cost:
$11,600
- - - - - - $13,830 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$13,830
-
$
05: 2.7423 REDUCE HEAT GAIN BY WINDOW TINTING Savings:
$54,090
Cost:
$104,500
$54,090 845,131 - - - - - - $54,090
845,131
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
06: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$86,560
Cost:
$331,000
$86,560 1,352,560 - - - - - - $86,560
1,352,560
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
07: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$96,070
Cost:
$380,000
$65,750 1,027,290 $30,320 2,700 - - - - $65,750
1,027,290
kWh
$30,320
2,700
kW-months/year
-
-
MMBtu
-
-
$
08: 2.2492 USE "HEAT WHEEL" OR OTHER HEAT EXCHANGER TO CROSS-EXCHANGE BUILDING EXHAUST AIR WITH MAKE-UP AIR Savings:
$20,534
Cost:
$96,100
$10,850 169,563 - - $9,684 1,696 - - $10,850
169,563
kWh
-
-
kW-months/year
$9,684
1,696
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$591,117
Cost:
$963,490
$293,543 4,586,656 $30,320 2,700 $253,424 44,382 $13,830 - $293,543
4,586,656
kWh
$30,320
2,700
kW-months/year
$253,424
44,382
MMBtu
$13,830
-
$
TOTAL IMPLEMENTED Savings:
$481,517
Cost:
$619,350
$205,713 3,214,228 $30,320 2,700 $245,484 42,992 - - $205,713
3,214,228
kWh
$30,320
2,700
kW-months/year
$245,484
42,992
MMBtu
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $
Electricity Usage Electricity Demand Natural Gas Administrative Changes Electricity Usage Electricity Demand Natural Gas Administrative Changes