Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Delaware
Assessment Year 2016
Principal Product Acrylic Molding Resins
NAICS 325211 - Plastics Material and Resin Manufacturing
SIC 2821 - Plastics Materials And Resins
Sales $100,000,000-$500,000,000
# of Employees 90
Plant Area (Sq.Ft.) 205,000
Annual Production 180,000,000 Pounds
Production Hrs. Annual 8,760
Location (State) PA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $2,639,954 27,577,200 kWh $0.10
Natural Gas $527,855 87,560 MMBtu $6.03
TOTAL ENERGY COSTS $4,454,514
RECOMMENDED SAVINGS* $371,700 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $371,700
#|Description Savings
Cost
Status Electricity Usage Natural Gas Water Disposal Other Liquid (non-haz) Electricity Usage Natural Gas Water Disposal Other Liquid (non-haz)
$ kWh $ MMBtu $ Tgal $ gal
01: 3.4114 REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER Savings:
$287,810
Cost:
$31,000
- - - - $198,450 11,340 $89,360 11,340,000 -
-
kWh
-
-
MMBtu
$198,450
11,340
Tgal
$89,360
11,340,000
gal
02: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$48,000
Cost:
$100,750
$48,000 500,000 - - - - - - $48,000
500,000
kWh
-
-
MMBtu
-
-
Tgal
-
-
gal
03: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$7,300
Cost:
$17,825
- - $7,300 1,210 - - - - -
-
kWh
$7,300
1,210
MMBtu
-
-
Tgal
-
-
gal
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$28,590
Cost:
$188,100
$28,590 297,840 - - - - - - $28,590
297,840
kWh
-
-
MMBtu
-
-
Tgal
-
-
gal
TOTAL RECOMMENDED Savings:
$371,700
Cost:
$337,675
$76,590 797,840 $7,300 1,210 $198,450 11,340 $89,360 11,340,000 $76,590
797,840
kWh
$7,300
1,210
MMBtu
$198,450
11,340
Tgal
$89,360
11,340,000
gal
TOTAL IMPLEMENTED Savings:
$371,700
Cost:
$337,675
$76,590 797,840 $7,300 1,210 $198,450 11,340 $89,360 11,340,000 $76,590
797,840
kWh
$7,300
1,210
MMBtu
$198,450
11,340
Tgal
$89,360
11,340,000
gal
Savings
Cost
$ kWh $ MMBtu $ Tgal $ gal
Electricity Usage Natural Gas Water Disposal Other Liquid (non-haz) Electricity Usage Natural Gas Water Disposal Other Liquid (non-haz)