Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Delaware |
---|---|
Assessment Year | 2016 |
Principal Product | Analytical Equipment |
NAICS | 334516 - Analytical Laboratory Instrument Manufacturing |
SIC | 3826 - Analytical Instruments |
Sales | $50,000,000-$100,000,000 |
# of Employees | 85 |
Plant Area (Sq.Ft.) | 37,500 |
Annual Production | 30,000 Pieces |
Production Hrs. Annual | 7,114 |
Location (State) | DE |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $363,335 | 4,003,929 | kWh | $0.09 |
Natural Gas | $80,146 | 8,809 | MMBtu | $9.10 |
TOTAL ENERGY COSTS | $477,800 | |||
RECOMMENDED SAVINGS* | $65,640 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $61,270 |
#|Description |
Savings Cost |
Status | Electricity Usage | Natural Gas | Other Liquid (non-haz) | Electricity Usage | Natural Gas | Other Liquid (non-haz) | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | MMBtu | $ | gal | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.7224 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS |
Savings: $22,170 Cost: - |
$5,700 | 62,605 | $16,470 | 1,810 | - | - |
$5,700 62,605 kWh |
$16,470 1,810 MMBtu |
- - gal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.6212 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME |
Savings: $7,660 Cost: - |
$880 | 9,680 | $6,780 | 745 | - | - |
$880 9,680 kWh |
$6,780 745 MMBtu |
- - gal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.7314 REDUCE VENTILATION AIR |
Savings: $2,430 Cost: $340 |
$1,390 | 15,280 | $1,040 | 114 | - | - |
$1,390 15,280 kWh |
$1,040 114 MMBtu |
- - gal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE |
Savings: $3,605 Cost: $800 |
$2,640 | 29,040 | - | - | $965 | 260,000 |
$2,640 29,040 kWh |
- - MMBtu |
$965 260,000 gal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.6212 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME |
Savings: $1,940 Cost: $510 |
$1,940 | 21,330 | - | - | - | - |
$1,940 21,330 kWh |
- - MMBtu |
- - gal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 3.4114 REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER |
Savings: $18,175 Cost: $10,500 |
$(-560) | (-6,170) | - | - | $18,735 | 5,050,000 |
$(-560) (-6,170) kWh |
- - MMBtu |
$18,735 5,050,000 gal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.6231 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED |
Savings: $1,730 Cost: $1,820 |
- | - | $1,730 | 190 | - | - |
- - kWh |
$1,730 190 MMBtu |
- - gal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $7,930 Cost: $29,230 |
$7,930 | 87,130 | - | - | - | - |
$7,930 87,130 kWh |
- - MMBtu |
- - gal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $65,640 Cost: $43,200 |
$19,920 | 218,895 | $26,020 | 2,859 | $19,700 | 5,310,000 | $19,920 218,895 kWh |
$26,020 2,859 MMBtu |
$19,700 5,310,000 gal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $61,270 Cost: $42,350 |
$16,590 | 182,285 | $24,980 | 2,745 | $19,700 | 5,310,000 | $16,590 182,285 kWh |
$24,980 2,745 MMBtu |
$19,700 5,310,000 gal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | MMBtu | $ | gal | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Natural Gas | Other Liquid (non-haz) | Electricity Usage | Natural Gas | Other Liquid (non-haz) |