IAC Assessment: DL0165
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: DL0165
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Delaware
Assessment Year 2016
Principal Product Treated Water
NAICS 221320 - Sewage Treatment Facilities
SIC 4952 - Sewerage Systems
Sales $5,000,000-$10,000,000
# of Employees 30
Plant Area (Sq.Ft.) 100,000
Annual Production 2,055,250 Thousand Gallons
Production Hrs. Annual 8,760
Location (State) MD
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $542,732 9,687,681 kWh $0.06
Natural Gas $7,006 1,281 MMBtu $5.47
TOTAL ENERGY COSTS $549,738
RECOMMENDED SAVINGS* $23,771 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $11,008
#|Description Savings
Cost
Status Electricity Usage Natural Gas Electricity Usage Natural Gas
$ kWh $ MMBtu
01: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$2,622
Cost:
$1,000
$2,622 46,820 - - $2,622
46,820
kWh
-
-
MMBtu
02: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$9,190
Cost:
$1,000
$9,190 164,086 - - $9,190
164,086
kWh
-
-
MMBtu
03: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$920
Cost:
$6,285
$920 16,350 - - $920
16,350
kWh
-
-
MMBtu
04: 2.6231 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED Savings:
$3,410
Cost:
$1,235
$3,410 60,970 - - $3,410
60,970
kWh
-
-
MMBtu
05: 2.6231 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED Savings:
$366
Cost:
$253
$366 6,530 - - $366
6,530
kWh
-
-
MMBtu
06: 2.6232 INSTALL SET-BACK TIMERS Savings:
$2,512
Cost:
$253
$510 9,120 $2,002 366 $510
9,120
kWh
$2,002
366
MMBtu
07: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$163
Cost:
-
$28 492 $135 25 $28
492
kWh
$135
25
MMBtu
08: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$940
Cost:
$3,431
$940 16,820 - - $940
16,820
kWh
-
-
MMBtu
09: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,618
Cost:
$11,052
$1,618 28,894 - - $1,618
28,894
kWh
-
-
MMBtu
10: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,030
Cost:
$8,740
$2,030 36,270 - - $2,030
36,270
kWh
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$23,771
Cost:
$33,249
$21,634 386,352 $2,137 391 $21,634
386,352
kWh
$2,137
391
MMBtu
TOTAL IMPLEMENTED Savings:
$11,008
Cost:
$31,014
$9,006 160,804 $2,002 366 $9,006
160,804
kWh
$2,002
366
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage Natural Gas Electricity Usage Natural Gas