IAC logo
IAC Assessment: DL0168
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: DL0168
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Delaware
Assessment Year 2016
Principal Product Coffee Packets
NAICS 311920 - Coffee and Tea Manufacturing
SIC 2095 - Roasted Coffee
Sales $500,000-$1,000,000
# of Employees 200
Plant Area (Sq.Ft.) 200,000
Annual Production 1,000,000 Units
Production Hrs. Annual 7,752
Location (State) PA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $696,487 8,497,913 kWh $0.08
Natural Gas $11,594 1,527 MMBtu $7.59
TOTAL ENERGY COSTS $712,997
RECOMMENDED SAVINGS* $139,755 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Natural Gas Water Usage Water Disposal Electricity Usage Natural Gas Water Usage Water Disposal
$ kWh $ MMBtu $ Tgal $ Tgal
01: 2.7224 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS Savings:
$3,910
Cost:
$200
$1,160 14,130 $2,750 362 - - - - $1,160
14,130
kWh
$2,750
362
MMBtu
-
-
Tgal
-
-
Tgal
02: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$2,380
Cost:
$200
$2,380 29,060 - - - - - - $2,380
29,060
kWh
-
-
MMBtu
-
-
Tgal
-
-
Tgal
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$5,120
Cost:
$1,000
$5,120 62,410 - - - - - - $5,120
62,410
kWh
-
-
MMBtu
-
-
Tgal
-
-
Tgal
04: 2.6231 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED Savings:
$67,220
Cost:
$62,600
$67,220 819,800 - - - - - - $67,220
819,800
kWh
-
-
MMBtu
-
-
Tgal
-
-
Tgal
05: 3.4154 ELIMINATE LEAKS IN WATER LINES AND VALVES Savings:
$4,520
Cost:
$6,800
- - - - $2,980 187 $1,540 187 -
-
kWh
-
-
MMBtu
$2,980
187
Tgal
$1,540
187
Tgal
06: 2.6231 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED Savings:
$4,385
Cost:
$7,400
$1,055 12,860 $3,330 439 - - - - $1,055
12,860
kWh
$3,330
439
MMBtu
-
-
Tgal
-
-
Tgal
07: 2.7224 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS Savings:
$2,320
Cost:
$4,980
$360 4,380 $1,960 258 - - - - $360
4,380
kWh
$1,960
258
MMBtu
-
-
Tgal
-
-
Tgal
08: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$22,000
Cost:
$67,370
$22,000 268,300 - - - - - - $22,000
268,300
kWh
-
-
MMBtu
-
-
Tgal
-
-
Tgal
09: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$27,900
Cost:
$190,600
$27,900 340,270 - - - - - - $27,900
340,270
kWh
-
-
MMBtu
-
-
Tgal
-
-
Tgal
TOTAL RECOMMENDED Savings:
$139,755
Cost:
$341,150
$127,195 1,551,210 $8,040 1,059 $2,980 187 $1,540 187 $127,195
1,551,210
kWh
$8,040
1,059
MMBtu
$2,980
187
Tgal
$1,540
187
Tgal
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - -
-
kWh
-
-
MMBtu
-
-
Tgal
-
-
Tgal
Savings
Cost
$ kWh $ MMBtu $ Tgal $ Tgal
Electricity Usage Natural Gas Water Usage Water Disposal Electricity Usage Natural Gas Water Usage Water Disposal