IAC logo
IAC Assessment: DL0171
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: DL0171
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Delaware
Assessment Year 2016
Principal Product Composite Armour
NAICS 325211 - Plastics Material and Resin Manufacturing
SIC 3624 - Carbon And Graphite Products
Sales $10,000,000-$50,000,000
# of Employees 50
Plant Area (Sq.Ft.) 250,000
Annual Production 40,000 Units
Production Hrs. Annual 3,432
Location (State) MD
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $135,427 2,316,475 kWh $0.06
Electricity Demand $51,934 9,170 kW-months/year $5.66
Electricity Fees $11,460 - $ -
Fuel Oil #1 $42,351 2,672 MMBtu $15.85
TOTAL ENERGY COSTS $241,172
RECOMMENDED SAVINGS* $39,309 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $7,289
#|Description Savings
Cost
Status Electricity Usage Fuel Oil #1 Electricity Usage Fuel Oil #1
$ kWh $ MMBtu
01: 4.444 INSTALL SYSTEM TO COLLECT SCRAP Savings:
$4,328
Cost:
$360
$4,328 53,428 - - $4,328
53,428
kWh
-
-
MMBtu
02: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$4,059
Cost:
$4,224
$4,059 50,115 - - $4,059
50,115
kWh
-
-
MMBtu
03: 2.7263 LOWER COMPRESSOR PRESSURE THROUGH A/C SYSTEM MODIFICATION Savings:
$374
Cost:
-
$374 4,613 - - $374
4,613
kWh
-
-
MMBtu
04: 2.4322 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES Savings:
$2,863
Cost:
$11,400
$2,863 35,346 - - $2,863
35,346
kWh
-
-
MMBtu
05: 2.4322 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES Savings:
$2,572
Cost:
$11,400
$2,572 31,747 - - $2,572
31,747
kWh
-
-
MMBtu
06: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$2,076
Cost:
$431
- - $2,076 131 -
-
kWh
$2,076
131
MMBtu
07: 2.7224 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS Savings:
$2,885
Cost:
-
- - $2,885 182 -
-
kWh
$2,885
182
MMBtu
08: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$6,911
Cost:
$588
$571 7,050 $6,340 400 $571
7,050
kWh
$6,340
400
MMBtu
09: 2.1123 INSTALL AUTOMATIC STACK DAMPER Savings:
$624
Cost:
$205
- - $624 39 -
-
kWh
$624
39
MMBtu
10: 2.7133 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE Savings:
$2,505
Cost:
$1,524
$2,505 30,900 - - $2,505
30,900
kWh
-
-
MMBtu
11: 2.6231 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED Savings:
$5,192
Cost:
$3,840
$5,192 64,100 - - $5,192
64,100
kWh
-
-
MMBtu
12: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$4,030
Cost:
-
$4,030 49,764 - - $4,030
49,764
kWh
-
-
MMBtu
13: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$890
Cost:
$4,170
$890 15,340 - - $890
15,340
kWh
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$39,309
Cost:
$38,142
$27,384 342,403 $11,925 752 $27,384
342,403
kWh
$11,925
752
MMBtu
TOTAL IMPLEMENTED Savings:
$7,289
Cost:
-
$4,404 54,377 $2,885 182 $4,404
54,377
kWh
$2,885
182
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage Fuel Oil #1 Electricity Usage Fuel Oil #1