Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Delaware |
---|---|
Assessment Year | 2016 |
Principal Product | Composite Armour |
NAICS | 325211 - Plastics Material and Resin Manufacturing |
SIC | 3624 - Carbon And Graphite Products |
Sales | $10,000,000-$50,000,000 |
# of Employees | 50 |
Plant Area (Sq.Ft.) | 250,000 |
Annual Production | 40,000 Units |
Production Hrs. Annual | 3,432 |
Location (State) | MD |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $135,427 | 2,316,475 | kWh | $0.06 |
Electricity Demand | $51,934 | 9,170 | kW-months/year | $5.66 |
Electricity Fees | $11,460 | - | $ | - |
Fuel Oil #1 | $42,351 | 2,672 | MMBtu | $15.85 |
TOTAL ENERGY COSTS | $241,172 | |||
RECOMMENDED SAVINGS* | $39,309 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $7,289 |
#|Description |
Savings Cost |
Status | Electricity Usage | Fuel Oil #1 | Electricity Usage | Fuel Oil #1 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | MMBtu | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 4.444 INSTALL SYSTEM TO COLLECT SCRAP |
Savings: $4,328 Cost: $360 |
$4,328 | 53,428 | - | - |
$4,328 53,428 kWh |
- - MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $4,059 Cost: $4,224 |
$4,059 | 50,115 | - | - |
$4,059 50,115 kWh |
- - MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.7263 LOWER COMPRESSOR PRESSURE THROUGH A/C SYSTEM MODIFICATION |
Savings: $374 Cost: - |
$374 | 4,613 | - | - |
$374 4,613 kWh |
- - MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4322 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES |
Savings: $2,863 Cost: $11,400 |
$2,863 | 35,346 | - | - |
$2,863 35,346 kWh |
- - MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4322 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES |
Savings: $2,572 Cost: $11,400 |
$2,572 | 31,747 | - | - |
$2,572 31,747 kWh |
- - MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT |
Savings: $2,076 Cost: $431 |
- | - | $2,076 | 131 |
- - kWh |
$2,076 131 MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.7224 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS |
Savings: $2,885 Cost: - |
- | - | $2,885 | 182 |
- - kWh |
$2,885 182 MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT |
Savings: $6,911 Cost: $588 |
$571 | 7,050 | $6,340 | 400 |
$571 7,050 kWh |
$6,340 400 MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 2.1123 INSTALL AUTOMATIC STACK DAMPER |
Savings: $624 Cost: $205 |
- | - | $624 | 39 |
- - kWh |
$624 39 MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
10: 2.7133 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE |
Savings: $2,505 Cost: $1,524 |
$2,505 | 30,900 | - | - |
$2,505 30,900 kWh |
- - MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
11: 2.6231 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED |
Savings: $5,192 Cost: $3,840 |
$5,192 | 64,100 | - | - |
$5,192 64,100 kWh |
- - MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
12: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE |
Savings: $4,030 Cost: - |
$4,030 | 49,764 | - | - |
$4,030 49,764 kWh |
- - MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
13: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $890 Cost: $4,170 |
$890 | 15,340 | - | - |
$890 15,340 kWh |
- - MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $39,309 Cost: $38,142 |
$27,384 | 342,403 | $11,925 | 752 | $27,384 342,403 kWh |
$11,925 752 MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $7,289 Cost: - |
$4,404 | 54,377 | $2,885 | 182 | $4,404 54,377 kWh |
$2,885 182 MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | MMBtu | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Fuel Oil #1 | Electricity Usage | Fuel Oil #1 |