IAC logo
IAC Assessment: DL0179
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: DL0179
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Delaware
Assessment Year 2020
Principal Product Plastic Buckets or Pails
NAICS 326199 - All Other Plastics Product Manufacturing
SIC 3089 - Plastics Products, Nec
Sales $50,000,000-$100,000,000
# of Employees 100
Plant Area (Sq.Ft.) 100,000
Annual Production 10,000,000 Units
Production Hrs. Annual 8,760
Location (State) DE
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $1,019,900 17,658,961 kWh $0.06
Electricity Demand $165,613 35,507 kW-months/year $4.66
Electricity Fees $7,391 - $ -
Other Gas $65,217 2,000 MMBtu $32.61
TOTAL ENERGY COSTS $1,258,121
RECOMMENDED SAVINGS* $150,430 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $61,320
#|Description Savings
Cost
Status Electricity Usage Other Gas Electricity Usage Other Gas
$ kWh $ MMBtu
01: 2.7243 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS Savings:
$8,390
Cost:
$2,500
$8,390 125,000 - - $8,390
125,000
kWh
-
-
MMBtu
02: 2.4224 UPGRADE CONTROLS ON COMPRESSORS Savings:
$7,410
Cost:
$6,500
$7,410 111,000 - - $7,410
111,000
kWh
-
-
MMBtu
03: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$5,600
Cost:
$600
$5,600 83,550 - - $5,600
83,550
kWh
-
-
MMBtu
04: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$16,200
Cost:
$17,000
$16,200 242,000 - - $16,200
242,000
kWh
-
-
MMBtu
05: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$3,580
Cost:
$15,000
$3,580 53,470 - - $3,580
53,470
kWh
-
-
MMBtu
06: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$26,500
Cost:
$11,625
- - $26,500 803 -
-
kWh
$26,500
803
MMBtu
07: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$17,250
Cost:
$13,450
$17,250 257,415 - - $17,250
257,415
kWh
-
-
MMBtu
08: 2.2692 USE OUTSIDE COLD WATER SOURCE AS A SUPPLY OF COOLING WATER Savings:
$65,500
Cost:
$47,500
$65,500 977,000 - - $65,500
977,000
kWh
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$150,430
Cost:
$114,175
$123,930 1,849,435 $26,500 803 $123,930
1,849,435
kWh
$26,500
803
MMBtu
TOTAL IMPLEMENTED Savings:
$61,320
Cost:
$43,175
$34,820 519,435 $26,500 803 $34,820
519,435
kWh
$26,500
803
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage Other Gas Electricity Usage Other Gas