IAC Assessment: DL0184
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: DL0184
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Delaware
Assessment Year 2020
Principal Product Plastic Films and Resin
NAICS 325211 - Plastics Material and Resin Manufacturing
SIC 2821 - Plastics Materials And Resins
Sales $10,000,000-$50,000,000
# of Employees 104
Plant Area (Sq.Ft.) 180,000
Annual Production 1,000,000 Units
Production Hrs. Annual 8,400
Location (State) DE
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $870,384 13,167,928 kWh $0.07
Electricity Demand $124,702 29,191 kW-months/year $4.27
Electricity Fees $8,267 - $ -
Natural Gas $194,335 37,340 MMBtu $5.20
TOTAL ENERGY COSTS $1,197,688
RECOMMENDED SAVINGS* $99,037 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $31,845
#|Description Savings
Cost
Status Electricity Usage Natural Gas Electricity Usage Natural Gas
$ kWh $ MMBtu
01: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$5,702
Cost:
-
$5,702 86,400 - - $5,702
86,400
kWh
-
-
MMBtu
02: 2.4226 USE / PURCHASE OPTIMUM SIZED COMPRESSOR Savings:
$22,300
Cost:
$15,661
$22,300 294,000 - - $22,300
294,000
kWh
-
-
MMBtu
03: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$41,700
Cost:
$6,337
$41,700 548,000 - - $41,700
548,000
kWh
-
-
MMBtu
04: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$2,170
Cost:
$4,250
- - $2,170 388 -
-
kWh
$2,170
388
MMBtu
05: 2.7243 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS Savings:
$9,500
Cost:
$1,400
$3,700 48,500 $5,800 1,035 $3,700
48,500
kWh
$5,800
1,035
MMBtu
06: 2.2511 INSULATE BARE EQUIPMENT Savings:
$4,400
Cost:
$4,750
- - $4,400 905 -
-
kWh
$4,400
905
MMBtu
07: 2.2511 INSULATE BARE EQUIPMENT Savings:
$800
Cost:
$95
- - $800 142 -
-
kWh
$800
142
MMBtu
08: 2.2511 INSULATE BARE EQUIPMENT Savings:
$2,680
Cost:
$152
- - $2,680 479 -
-
kWh
$2,680
479
MMBtu
09: 2.5112 USE CONTINUOUS EQUIPMENT WHICH RETAINS PROCESS HEATING CONVEYORS WITHIN THE HEATED CHAMBER Savings:
$240
Cost:
$40
$240 3,120 - - $240
3,120
kWh
-
-
MMBtu
10: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$7,390
Cost:
$3,079
$7,390 97,200 - - $7,390
97,200
kWh
-
-
MMBtu
11: 2.7314 REDUCE VENTILATION AIR Savings:
$940
Cost:
-
$940 12,370 - - $940
12,370
kWh
-
-
MMBtu
12: 2.7211 CLEAN AND MAINTAIN REFRIGERANT CONDENSERS AND TOWERS Savings:
$1,215
Cost:
$400
$1,215 16,000 - - $1,215
16,000
kWh
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$99,037
Cost:
$36,164
$83,187 1,105,590 $15,850 2,949 $83,187
1,105,590
kWh
$15,850
2,949
MMBtu
TOTAL IMPLEMENTED Savings:
$31,845
Cost:
$19,140
$31,845 419,570 - - $31,845
419,570
kWh
-
-
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage Natural Gas Electricity Usage Natural Gas