Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Delaware |
---|---|
Assessment Year | 2021 |
Principal Product | Canned Beverages |
NAICS | 312111 - Soft Drink Manufacturing |
SIC | 2086 - Bottled And Canned Soft Drinks |
Sales | $100,000,000-$500,000,000 |
# of Employees | 62 |
Plant Area (Sq.Ft.) | 50,000 |
Annual Production | 27,000 Thousand Gallons |
Production Hrs. Annual | 7,956 |
Location (State) | NJ |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $467,853 | 5,298,792 | kWh | $0.09 |
Electricity Demand | $84,419 | 11,976 | kW-months/year | $7.05 |
Electricity Fees | $4,450 | - | $ | - |
Natural Gas | $94,615 | 15,670 | MMBtu | $6.04 |
TOTAL ENERGY COSTS | $651,337 | |||
RECOMMENDED SAVINGS* | $104,200 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $60,170 |
#|Description |
Savings Cost |
Status | Electricity Usage | Natural Gas | Water Usage | Electricity Usage | Natural Gas | Water Usage | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | MMBtu | $ | Tgal | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 3.4154 ELIMINATE LEAKS IN WATER LINES AND VALVES |
Savings: $5,300 Cost: $425 |
- | - | $3,100 | 513 | $2,200 | 261 |
- - kWh |
$3,100 513 MMBtu |
$2,200 261 Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $12,750 Cost: $2,550 |
$12,750 | 122,600 | - | - | - | - |
$12,750 122,600 kWh |
- - MMBtu |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT |
Savings: $6,300 Cost: $3,250 |
$2,680 | 25,730 | $3,620 | 600 | - | - |
$2,680 25,730 kWh |
$3,620 600 MMBtu |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $28,940 Cost: $20,000 |
$28,940 | 278,300 | - | - | - | - |
$28,940 278,300 kWh |
- - MMBtu |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $13,110 Cost: $72,258 |
$13,110 | 126,013 | - | - | - | - |
$13,110 126,013 kWh |
- - MMBtu |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT |
Savings: $12,820 Cost: $24,000 |
$16,720 | 160,800 | $(-3,900) | (-646) | - | - |
$16,720 160,800 kWh |
$(-3,900) (-646) MMBtu |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.1221 REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES |
Savings: $24,980 Cost: $15,000 |
- | - | $24,980 | 4,135 | - | - |
- - kWh |
$24,980 4,135 MMBtu |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $104,200 Cost: $137,483 |
$74,200 | 713,443 | $27,800 | 4,602 | $2,200 | 261 | $74,200 713,443 kWh |
$27,800 4,602 MMBtu |
$2,200 261 Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $60,170 Cost: $116,683 |
$58,770 | 565,113 | $(-800) | (-133) | $2,200 | 261 | $58,770 565,113 kWh |
$(-800) (-133) MMBtu |
$2,200 261 Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | MMBtu | $ | Tgal | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Natural Gas | Water Usage | Electricity Usage | Natural Gas | Water Usage |