IAC Assessment: DL0189
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: DL0189
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Delaware
Assessment Year 2021
Principal Product Canned Beverages
NAICS 312111 - Soft Drink Manufacturing
SIC 2086 - Bottled And Canned Soft Drinks
Sales $100,000,000-$500,000,000
# of Employees 62
Plant Area (Sq.Ft.) 50,000
Annual Production 27,000 Thousand Gallons
Production Hrs. Annual 7,956
Location (State) NJ
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $467,853 5,298,792 kWh $0.09
Electricity Demand $84,419 11,976 kW-months/year $7.05
Electricity Fees $4,450 - $ -
Natural Gas $94,615 15,670 MMBtu $6.04
TOTAL ENERGY COSTS $651,337
RECOMMENDED SAVINGS* $104,200 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $60,170
#|Description Savings
Cost
Status Electricity Usage Natural Gas Water Usage Electricity Usage Natural Gas Water Usage
$ kWh $ MMBtu $ Tgal
01: 3.4154 ELIMINATE LEAKS IN WATER LINES AND VALVES Savings:
$5,300
Cost:
$425
- - $3,100 513 $2,200 261 -
-
kWh
$3,100
513
MMBtu
$2,200
261
Tgal
02: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$12,750
Cost:
$2,550
$12,750 122,600 - - - - $12,750
122,600
kWh
-
-
MMBtu
-
-
Tgal
03: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$6,300
Cost:
$3,250
$2,680 25,730 $3,620 600 - - $2,680
25,730
kWh
$3,620
600
MMBtu
-
-
Tgal
04: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$28,940
Cost:
$20,000
$28,940 278,300 - - - - $28,940
278,300
kWh
-
-
MMBtu
-
-
Tgal
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$13,110
Cost:
$72,258
$13,110 126,013 - - - - $13,110
126,013
kWh
-
-
MMBtu
-
-
Tgal
06: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$12,820
Cost:
$24,000
$16,720 160,800 $(-3,900) (-646) - - $16,720
160,800
kWh
$(-3,900)
(-646)
MMBtu
-
-
Tgal
07: 2.1221 REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES Savings:
$24,980
Cost:
$15,000
- - $24,980 4,135 - - -
-
kWh
$24,980
4,135
MMBtu
-
-
Tgal
TOTAL RECOMMENDED Savings:
$104,200
Cost:
$137,483
$74,200 713,443 $27,800 4,602 $2,200 261 $74,200
713,443
kWh
$27,800
4,602
MMBtu
$2,200
261
Tgal
TOTAL IMPLEMENTED Savings:
$60,170
Cost:
$116,683
$58,770 565,113 $(-800) (-133) $2,200 261 $58,770
565,113
kWh
$(-800)
(-133)
MMBtu
$2,200
261
Tgal
Savings
Cost
$ kWh $ MMBtu $ Tgal
Electricity Usage Natural Gas Water Usage Electricity Usage Natural Gas Water Usage