IAC logo
IAC Assessment: DL0198
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: DL0198
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Delaware
Assessment Year 2021
Principal Product Plastic Containers
NAICS 326121 - Unlaminated Plastics Profile Shape Manufacturing
SIC 3089 - Plastics Products, Nec
Sales $10,000,000-$50,000,000
# of Employees 127
Plant Area (Sq.Ft.) 155,000
Annual Production 10,260,000 Units
Production Hrs. Annual 8,400
Location (State) DE
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $556,908 5,561,897 kWh $0.10
Electricity Demand $142,151 13,145 kW-months/year $10.81
Natural Gas $18,378 2,269 MMBtu $8.10
TOTAL ENERGY COSTS $717,437
RECOMMENDED SAVINGS* $133,674 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $71,630
#|Description Savings
Cost
Status Electricity Usage Natural Gas Electricity Usage Natural Gas
$ kWh $ MMBtu
01: 2.6231 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED Savings:
$12,850
Cost:
-
$12,850 128,500 - - $12,850
128,500
kWh
-
-
MMBtu
02: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$15,800
Cost:
-
$15,800 158,000 - - $15,800
158,000
kWh
-
-
MMBtu
03: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$10,100
Cost:
$6,477
$10,100 101,000 - - $10,100
101,000
kWh
-
-
MMBtu
04: 3.4156 USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE Savings:
$16,090
Cost:
$1,500
$16,090 160,900 - - $16,090
160,900
kWh
-
-
MMBtu
05: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$9,240
Cost:
$2,500
$9,240 92,400 - - $9,240
92,400
kWh
-
-
MMBtu
06: 2.2511 INSULATE BARE EQUIPMENT Savings:
$2,034
Cost:
$5,600
$2,034 20,340 - - $2,034
20,340
kWh
-
-
MMBtu
07: 2.6231 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED Savings:
$29,500
Cost:
-
$29,500 295,000 - - $29,500
295,000
kWh
-
-
MMBtu
08: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$4,320
Cost:
$7,000
- - $4,320 533 -
-
kWh
$4,320
533
MMBtu
09: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$33,740
Cost:
$14,428
$33,740 337,400 - - $33,740
337,400
kWh
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$133,674
Cost:
$37,505
$129,354 1,293,540 $4,320 533 $129,354
1,293,540
kWh
$4,320
533
MMBtu
TOTAL IMPLEMENTED Savings:
$71,630
Cost:
$16,928
$71,630 716,300 - - $71,630
716,300
kWh
-
-
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage Natural Gas Electricity Usage Natural Gas