IAC logo
IAC Assessment: DL0214
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: DL0214
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Delaware
Assessment Year 2022
Principal Product Fuel Cell Server
NAICS 335999 - All Other Miscellaneous Electrical Equipment and Component Manufacturing
SIC 3629 - Electrical Industrial Apparatus, Nec
Sales $10,000,000-$50,000,000
# of Employees 688
Plant Area (Sq.Ft.) 76,000
Annual Production 3,610 Units
Production Hrs. Annual 2,289
Location (State) DE
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $58,815 474,683 kWh $0.12
Electricity Demand $5,043 690 kW-months/year $7.31
Electricity Fees $9,181 - $ -
Natural Gas $29,472 3,435 MMBtu $8.58
TOTAL ENERGY COSTS $102,511
RECOMMENDED SAVINGS* $34,102 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Natural Gas Electricity Usage Natural Gas
$ kWh $ MMBtu
01: 2.7316 CENTRALIZE CONTROL OF EXHAUST FANS TO ENSURE THEIR SHUTDOWN, OR ESTABLISH PROGRAM TO ENSURE MANUAL SHUTDOWN Savings:
$11,355
Cost:
-
$4,319 31,996 $7,036 820 $4,319
31,996
kWh
$7,036
820
MMBtu
02: 2.6231 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED Savings:
$3,586
Cost:
-
$3,586 26,565 - - $3,586
26,565
kWh
-
-
MMBtu
03: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$5,002
Cost:
$1,348
- - $5,002 583 -
-
kWh
$5,002
583
MMBtu
04: 2.6231 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED Savings:
$5,516
Cost:
$401
$2,002 14,832 $3,514 410 $2,002
14,832
kWh
$3,514
410
MMBtu
05: 2.6231 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED Savings:
$4,368
Cost:
$485
$4,368 32,353 - - $4,368
32,353
kWh
-
-
MMBtu
06: 2.4226 USE / PURCHASE OPTIMUM SIZED COMPRESSOR Savings:
$2,919
Cost:
$16,000
$2,919 21,623 - - $2,919
21,623
kWh
-
-
MMBtu
07: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$735
Cost:
$755
$735 5,448 - - $735
5,448
kWh
-
-
MMBtu
08: 2.7492 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE Savings:
$621
Cost:
$2,500
- - $621 72 -
-
kWh
$621
72
MMBtu
TOTAL RECOMMENDED Savings:
$34,102
Cost:
$21,489
$17,929 132,817 $16,173 1,885 $17,929
132,817
kWh
$16,173
1,885
MMBtu
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - -
-
kWh
-
-
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage Natural Gas Electricity Usage Natural Gas