Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Delaware |
---|---|
Assessment Year | 2024 |
Principal Product | Corrugated Paper |
NAICS | 322211 - Corrugated and Solid Fiber Box Manufacturing |
SIC | 2679 - Converted Paper Products, Nec |
Sales | $50,000,000-$100,000,000 |
# of Employees | 154 |
Plant Area (Sq.Ft.) | 215,000 |
Annual Production | 634,000 Thousand Feet |
Production Hrs. Annual | 6,400 |
Location (State) | MD |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $714,467 | 6,069,577 | kWh | $0.12 |
Electricity Demand | $180,581 | 11,785 | kW-months/year | $15.32 |
Electricity Fees | $5,965 | - | $ | - |
Natural Gas | $393,363 | 57,744 | MMBtu | $6.81 |
TOTAL ENERGY COSTS | $1,294,376 | |||
RECOMMENDED SAVINGS* | $449,475 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | - |
#|Description |
Savings Cost |
Status | Electricity Usage | Natural Gas | Water Usage | One-time Revenue or Avoided Cost | Electricity Usage | Natural Gas | Water Usage | One-time Revenue or Avoided Cost | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | MMBtu | $ | Tgal | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.2127 FLASH CONDENSATE TO PRODUCE LOWER PRESSURE STEAM |
Savings: $6,357 Cost: $1,000 |
- | - | $5,421 | 796 | $936 | 73 | - | - |
- - kWh |
$5,421 796 MMBtu |
$936 73 Tgal |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4226 USE / PURCHASE OPTIMUM SIZED COMPRESSOR |
Savings: $6,768 Cost: - |
$6,768 | 57,352 | - | - | - | - | - | - |
$6,768 57,352 kWh |
- - MMBtu |
- - Tgal |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE |
Savings: $22,165 Cost: $5,000 |
$22,165 | 187,840 | - | - | - | - | - | - |
$22,165 187,840 kWh |
- - MMBtu |
- - Tgal |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $52,278 Cost: $20,000 |
$52,278 | 443,034 | - | - | - | - | - | - |
$52,278 443,034 kWh |
- - MMBtu |
- - Tgal |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 3.4155 METER WASTE WATER |
Savings: $7,907 Cost: $2,000 |
- | - | - | - | - | - | $7,907 | - |
- - kWh |
- - MMBtu |
- - Tgal |
$7,907 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.9114 USE SOLAR HEAT TO MAKE ELECTRICTY |
Savings: $354,000 Cost: $3,000,000 |
$354,000 | 3,000,000 | - | - | - | - | - | - |
$354,000 3,000,000 kWh |
- - MMBtu |
- - Tgal |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $449,475 Cost: $3,028,000 |
$435,211 | 3,688,226 | $5,421 | 796 | $936 | 73 | $7,907 | - | $435,211 3,688,226 kWh |
$5,421 796 MMBtu |
$936 73 Tgal |
$7,907 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: - Cost: - |
- | - | - | - | - | - | - | - | - - kWh |
- - MMBtu |
- - Tgal |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | MMBtu | $ | Tgal | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Natural Gas | Water Usage | One-time Revenue or Avoided Cost | Electricity Usage | Natural Gas | Water Usage | One-time Revenue or Avoided Cost |