IAC logo
IAC Assessment: DL0259
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: DL0259
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Delaware
Assessment Year 2025
Principal Product Oat based fluid milk
NAICS 311511 - Fluid Milk Manufacturing
SIC 2026 - Fluid Milk
Sales $100,000,000-$500,000,000
# of Employees 40
Plant Area (Sq.Ft.) 50,000
Annual Production 13,209 Thousand Gallons
Production Hrs. Annual 6,240
Location (State) NJ
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $621,879 5,162,563 kWh $0.12
Electricity Demand $58,354 18,940 kW-months/year $3.08
Electricity Fees $33,388 - $ -
Natural Gas $243,950 22,867 MMBtu $10.67
TOTAL ENERGY COSTS $957,571
RECOMMENDED SAVINGS* $73,436 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas
$ kWh $ kW-months/year $ MMBtu
01: 3.1191 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS Savings:
$45,458
Cost:
$19,000
- - - - $45,458 2,750 -
-
kWh
-
-
kW-months/year
$45,458
2,750
MMBtu
02: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$11,620
Cost:
$30,000
- - - - $11,620 703 -
-
kWh
-
-
kW-months/year
$11,620
703
MMBtu
03: 2.1243 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER Savings:
$3,091
Cost:
$13,000
- - - - $3,091 183 -
-
kWh
-
-
kW-months/year
$3,091
183
MMBtu
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$3,217
Cost:
$5,500
$3,114 24,519 $104 34 - - $3,114
24,519
kWh
$104
34
kW-months/year
-
-
MMBtu
05: 2.2424 USE HEAT IN FLUE GASES TO PREHEAT PRODUCTS OR MATERIALS Savings:
$10,050
Cost:
$40,000
- - - - $10,050 608 -
-
kWh
-
-
kW-months/year
$10,050
608
MMBtu
TOTAL RECOMMENDED Savings:
$73,436
Cost:
$107,500
$3,114 24,519 $104 34 $70,219 4,244 $3,114
24,519
kWh
$104
34
kW-months/year
$70,219
4,244
MMBtu
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu
Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas