IAC logo
IAC Assessment: DS0075
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: DS0075
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center South Dakota State
Assessment Year 1996
Principal Product Polyethylene and Fiberglass Tanks
NAICS n/a
SIC 3089 - Plastics Products, Nec
Sales $5,000,000-$10,000,000
# of Employees 70
Plant Area (Sq.Ft.) 113,000
Annual Production 60,000 Pieces
Production Hrs. Annual 4,472
Location (State) SD
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $53,497 1,745,311 kWh $0.03
Electricity Demand $51,228 6,984 kW-months/year $7.34
Electricity Fees $8,772 - $ -
Natural Gas $41,999 11,994 MMBtu $3.50
LPG $64,904 9,525 MMBtu $6.81
TOTAL ENERGY COSTS $247,400
RECOMMENDED SAVINGS* $41,971 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $20,857
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Natural Gas Solid Waste (non-haz) Electricity Usage Electricity Demand Electricity Fees Natural Gas Solid Waste (non-haz)
$ kWh $ kW-months/year $ $ $ MMBtu $ lb
01: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$2,348
Cost:
$1,700
- - - - $2,348 - - - - - -
-
kWh
-
-
kW-months/year
$2,348
-
$
-
-
MMBtu
-
-
lb
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$5,487
Cost:
$21,753
$3,232 104,338 $2,255 294 - - - - - - $3,232
104,338
kWh
$2,255
294
kW-months/year
-
-
$
-
-
MMBtu
-
-
lb
03: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$8,576
Cost:
$8,500
$643 20,809 - - - - $7,933 2,267 - - $643
20,809
kWh
-
-
kW-months/year
-
-
$
$7,933
2,267
MMBtu
-
-
lb
04: 3.1175 USE A DIFFERENT OR RECYCLED RAW MATERIAL Savings:
$21,114
Cost:
-
- - - - - - - - $21,114 - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
$21,114
-
lb
05: 2.6232 INSTALL SET-BACK TIMERS Savings:
$2,926
Cost:
$150
- - - - - - $2,926 836 - - -
-
kWh
-
-
kW-months/year
-
-
$
$2,926
836
MMBtu
-
-
lb
06: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$1,520
Cost:
-
- - - - - - $1,520 606 - - -
-
kWh
-
-
kW-months/year
-
-
$
$1,520
606
MMBtu
-
-
lb
TOTAL RECOMMENDED Savings:
$41,971
Cost:
$32,103
$3,875 125,147 $2,255 294 $2,348 - $12,379 3,709 $21,114 - $3,875
125,147
kWh
$2,255
294
kW-months/year
$2,348
-
$
$12,379
3,709
MMBtu
$21,114
-
lb
TOTAL IMPLEMENTED Savings:
$20,857
Cost:
$32,103
$3,875 125,147 $2,255 294 $2,348 - $12,379 3,709 - - $3,875
125,147
kWh
$2,255
294
kW-months/year
$2,348
-
$
$12,379
3,709
MMBtu
-
-
lb
Savings
Cost
$ kWh $ kW-months/year $ $ $ MMBtu $ lb
Electricity Usage Electricity Demand Electricity Fees Natural Gas Solid Waste (non-haz) Electricity Usage Electricity Demand Electricity Fees Natural Gas Solid Waste (non-haz)