IAC logo
IAC Assessment: DS0079
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: DS0079
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center South Dakota State
Assessment Year 1997
Principal Product Aircraft Test Equipment
NAICS n/a
SIC 3537 - Industrial Trucks And Tractors
Sales $10,000,000-$50,000,000
# of Employees 125
Plant Area (Sq.Ft.) 40,740
Annual Production 16 Pieces
Production Hrs. Annual 3,380
Location (State) MN
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $22,656 621,336 kWh $0.04
Electricity Demand $16,843 2,436 kW-months/year $6.91
Electricity Fees $1,488 - $ -
Natural Gas $12,362 2,685 MMBtu $4.60
TOTAL ENERGY COSTS $58,758
RECOMMENDED SAVINGS* $11,841 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $5,893
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Water Disposal Other Liquid (haz) Solid Waste (non-haz) Personnel Changes Ancillary Material Cost Water Consumption Electricity Usage Electricity Demand Water Disposal Other Liquid (haz) Solid Waste (non-haz) Personnel Changes Ancillary Material Cost Water Consumption
$ kWh $ kW-months/year $ Tgal $ gal $ lb $ $ $ $ $ Tgal
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$3,837
Cost:
$15,866
$2,280 63,306 $1,557 226 - - - - - - - - - - - - $2,280
63,306
kWh
$1,557
226
kW-months/year
-
-
Tgal
-
-
gal
-
-
lb
-
-
$
-
-
$
-
-
Tgal
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$161
Cost:
$260
$161 4,396 - - - - - - - - - - - - - - $161
4,396
kWh
-
-
kW-months/year
-
-
Tgal
-
-
gal
-
-
lb
-
-
$
-
-
$
-
-
Tgal
03: 3.8142 DISTILL CONTAMINATED SOLVENTS FOR REUSE Savings:
$1,071
Cost:
$6,000
- - - - $(-89) (-7,140) $820 119 - - - - $483 - $(-143) - -
-
kWh
-
-
kW-months/year
$(-89)
(-7,140)
Tgal
$820
119
gal
-
-
lb
-
-
$
$483
-
$
$(-143)
-
Tgal
04: 3.5315 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER Savings:
$1,040
Cost:
$4,750
- - - - - - - - $1,040 5,600 - - - - - - -
-
kWh
-
-
kW-months/year
-
-
Tgal
-
-
gal
$1,040
5,600
lb
-
-
$
-
-
$
-
-
Tgal
05: 3.2124 CONVERT TO AIR ASSISTED / AIRLESS PAINT GUNS Savings:
$5,732
Cost:
$7,500
- - - - - - $2,080 55 - - $3,652 - - - - - -
-
kWh
-
-
kW-months/year
-
-
Tgal
$2,080
55
gal
-
-
lb
$3,652
-
$
-
-
$
-
-
Tgal
TOTAL RECOMMENDED Savings:
$11,841
Cost:
$34,376
$2,441 67,702 $1,557 226 $(-89) (-7,140) $2,900 174 $1,040 5,600 $3,652 - $483 - $(-143) - $2,441
67,702
kWh
$1,557
226
kW-months/year
$(-89)
(-7,140)
Tgal
$2,900
174
gal
$1,040
5,600
lb
$3,652
-
$
$483
-
$
$(-143)
-
Tgal
TOTAL IMPLEMENTED Savings:
$5,893
Cost:
$7,760
$161 4,396 - - - - $2,080 55 - - $3,652 - - - - - $161
4,396
kWh
-
-
kW-months/year
-
-
Tgal
$2,080
55
gal
-
-
lb
$3,652
-
$
-
-
$
-
-
Tgal
Savings
Cost
$ kWh $ kW-months/year $ Tgal $ gal $ lb $ $ $ $ $ Tgal
Electricity Usage Electricity Demand Water Disposal Other Liquid (haz) Solid Waste (non-haz) Personnel Changes Ancillary Material Cost Water Consumption Electricity Usage Electricity Demand Water Disposal Other Liquid (haz) Solid Waste (non-haz) Personnel Changes Ancillary Material Cost Water Consumption