IAC Assessment: DS0083
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: DS0083
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center South Dakota State
Assessment Year 1997
Principal Product Farm Equipment and Custom Metal Fabrication
NAICS n/a
SIC 3523 - Farm Machinery And Equipment
Sales $5,000,000-$10,000,000
# of Employees 85
Plant Area (Sq.Ft.) 109,371
Annual Production 80,000 Pounds
Production Hrs. Annual 4,160
Location (State) MN
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $24,153 872,802 kWh $0.03
Electricity Demand $35,008 2,947 kW-months/year $11.88
Electricity Fees $2,241 - $ -
Natural Gas $12,362 13,895 MMBtu $0.89
LPG $7,244 666 MMBtu $10.88
TOTAL ENERGY COSTS $84,224
RECOMMENDED SAVINGS* $30,373 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $26,541
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost Water Consumption Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost Water Consumption
$ kWh $ kW-months/year $ MMBtu $ $ $ $ $ Tgal
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$4,163
Cost:
$7,878
$1,241 44,256 $2,922 246 - - - - - - - - $1,241
44,256
kWh
$2,922
246
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
-
-
Tgal
02: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$3,832
Cost:
$1,000
- - - - $3,832 1,666 - - - - - - -
-
kWh
-
-
kW-months/year
$3,832
1,666
MMBtu
-
-
$
-
-
$
-
-
Tgal
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,269
Cost:
$256
$784 28,136 $485 41 - - - - - - - - $784
28,136
kWh
$485
41
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
-
-
Tgal
04: 3.5311 RECOVER AND REUSE WASTE MATERIAL Savings:
$3,750
Cost:
$4,844
- - - - - - - - $3,750 - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
$3,750
-
$
-
-
Tgal
05: 3.4154 ELIMINATE LEAKS IN WATER LINES AND VALVES Savings:
$589
Cost:
$352
- - - - - - - - - - $589 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
$589
-
Tgal
06: 3.2176 INCREASE USE OF AUTOMATION Savings:
$16,770
Cost:
$30,000
- - - - - - $16,770 - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$16,770
-
$
-
-
$
-
-
Tgal
TOTAL RECOMMENDED Savings:
$30,373
Cost:
$44,330
$2,025 72,392 $3,407 287 $3,832 1,666 $16,770 - $3,750 - $589 - $2,025
72,392
kWh
$3,407
287
kW-months/year
$3,832
1,666
MMBtu
$16,770
-
$
$3,750
-
$
$589
-
Tgal
TOTAL IMPLEMENTED Savings:
$26,541
Cost:
$43,330
$2,025 72,392 $3,407 287 - - $16,770 - $3,750 - $589 - $2,025
72,392
kWh
$3,407
287
kW-months/year
-
-
MMBtu
$16,770
-
$
$3,750
-
$
$589
-
Tgal
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $ $ Tgal
Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost Water Consumption Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost Water Consumption