IAC logo
IAC Assessment: DS0087
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: DS0087
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center South Dakota State
Assessment Year 1997
Principal Product Hand Rollers and Auto Sleeves
NAICS n/a
SIC 3599 - Industrial Machinery, Nec
Sales $10,000,000-$50,000,000
# of Employees 140
Plant Area (Sq.Ft.) 83,235
Annual Production 114 Pieces
Production Hrs. Annual 4,160
Location (State) MN
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $34,978 868,699 kWh $0.04
Electricity Demand $4,416 2,208 kW-months/year $2.00
Electricity Fees $2,942 - $ -
Natural Gas $16,029 3,123 MMBtu $5.13
TOTAL ENERGY COSTS $68,859
RECOMMENDED SAVINGS* $72,374 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $8,826
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Other Liquid (haz) Solid Waste (non-haz) Personnel Changes Administrative Changes Electricity Usage Electricity Demand Other Liquid (haz) Solid Waste (non-haz) Personnel Changes Administrative Changes
$ kWh $ kW-months/year $ gal $ lb $ $ $ $
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$3,061
Cost:
$60
$2,925 72,685 $136 68 - - - - - - - - $2,925
72,685
kWh
$136
68
kW-months/year
-
-
gal
-
-
lb
-
-
$
-
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,586
Cost:
$10,503
$2,288 56,858 $298 149 - - - - - - - - $2,288
56,858
kWh
$298
149
kW-months/year
-
-
gal
-
-
lb
-
-
$
-
-
$
03: 3.5316 CONTRACT A WOOD PALLET RECYCLING COMPANY Savings:
$675
Cost:
$100
- - - - - - - - - - $675 - -
-
kWh
-
-
kW-months/year
-
-
gal
-
-
lb
-
-
$
$675
-
$
04: 3.7131 USE A RAG RECYCLE SERVICE Savings:
$2,250
Cost:
$750
- - - - - - $2,250 14,400 - - - - -
-
kWh
-
-
kW-months/year
-
-
gal
$2,250
14,400
lb
-
-
$
-
-
$
05: 3.5315 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER Savings:
$3,009
Cost:
$4,500
- - - - - - $3,009 32,400 - - - - -
-
kWh
-
-
kW-months/year
-
-
gal
$3,009
32,400
lb
-
-
$
-
-
$
06: 3.2121 CONVERT TO ELECTROSTATIC POWDER COATING Savings:
$3,515
Cost:
$6,000
- - - - $1,715 46 - - $1,800 - - - -
-
kWh
-
-
kW-months/year
$1,715
46
gal
-
-
lb
$1,800
-
$
-
-
$
07: 4.5130 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS Savings:
$57,278
Cost:
$44,580
- - - - - - - - - - $57,278 - -
-
kWh
-
-
kW-months/year
-
-
gal
-
-
lb
-
-
$
$57,278
-
$
TOTAL RECOMMENDED Savings:
$72,374
Cost:
$66,493
$5,213 129,543 $434 217 $1,715 46 $5,259 46,800 $1,800 - $57,953 - $5,213
129,543
kWh
$434
217
kW-months/year
$1,715
46
gal
$5,259
46,800
lb
$1,800
-
$
$57,953
-
$
TOTAL IMPLEMENTED Savings:
$8,826
Cost:
$6,810
$2,925 72,685 $136 68 $1,715 46 $2,250 14,400 $1,800 - - - $2,925
72,685
kWh
$136
68
kW-months/year
$1,715
46
gal
$2,250
14,400
lb
$1,800
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ gal $ lb $ $ $ $
Electricity Usage Electricity Demand Other Liquid (haz) Solid Waste (non-haz) Personnel Changes Administrative Changes Electricity Usage Electricity Demand Other Liquid (haz) Solid Waste (non-haz) Personnel Changes Administrative Changes