IAC logo
IAC Assessment: DS0088
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: DS0088
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center South Dakota State
Assessment Year 1997
Principal Product Steam Generators
NAICS n/a
SIC 3443 - Fabricated Plate Work (boiler Shops)
Sales $50,000,000-$100,000,000
# of Employees 180
Plant Area (Sq.Ft.) 83,600
Annual Production 40 Pieces
Production Hrs. Annual 4,108
Location (State) MN
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $72,898 2,352,286 kWh $0.03
Electricity Demand $55,027 6,840 kW-months/year $8.04
Electricity Fees $5,592 - $ -
Natural Gas $69,657 16,204 MMBtu $4.30
TOTAL ENERGY COSTS $208,574
RECOMMENDED SAVINGS* $113,460 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $29,136
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Solid Waste (non-haz) Personnel Changes Electricity Usage Electricity Demand Solid Waste (non-haz) Personnel Changes
$ kWh $ kW-months/year $ lb $ $
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,136
Cost:
$75
$836 26,964 $300 39 - - - - $836
26,964
kWh
$300
39
kW-months/year
-
-
lb
-
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,164
Cost:
$5,126
$1,132 36,635 $1,032 136 - - - - $1,132
36,635
kWh
$1,032
136
kW-months/year
-
-
lb
-
-
$
03: 3.5315 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER Savings:
$28,000
Cost:
$4,500
- - - - $28,000 - - - -
-
kWh
-
-
kW-months/year
$28,000
-
lb
-
-
$
04: 4.1220 DEVELOP STANDARD PROCEDURES TO IMPROVE INTERNAL YIELDS Savings:
$82,160
Cost:
$340
- - - - - - $82,160 - -
-
kWh
-
-
kW-months/year
-
-
lb
$82,160
-
$
TOTAL RECOMMENDED Savings:
$113,460
Cost:
$10,041
$1,968 63,599 $1,332 175 $28,000 - $82,160 - $1,968
63,599
kWh
$1,332
175
kW-months/year
$28,000
-
lb
$82,160
-
$
TOTAL IMPLEMENTED Savings:
$29,136
Cost:
$4,575
$836 26,964 $300 39 $28,000 - - - $836
26,964
kWh
$300
39
kW-months/year
$28,000
-
lb
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ lb $ $
Electricity Usage Electricity Demand Solid Waste (non-haz) Personnel Changes Electricity Usage Electricity Demand Solid Waste (non-haz) Personnel Changes