IAC logo
IAC Assessment: DS0090
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: DS0090
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center South Dakota State
Assessment Year 1997
Principal Product Fine Line Computer Components
NAICS n/a
SIC 3231 - Products Of Purchased Glass
Sales $10,000,000-$50,000,000
# of Employees 230
Plant Area (Sq.Ft.) 116,800
Annual Production 1,500,000 Pieces
Production Hrs. Annual 5,200
Location (State) MN
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $114,092 6,421,747 kWh $0.02
Electricity Demand $94,685 14,076 kW-months/year $6.73
Electricity Fees $2,237 - $ -
Natural Gas $63,908 21,825 MMBtu $2.93
LPG $14,800 1,385 MMBtu $10.69
TOTAL ENERGY COSTS $390,276
RECOMMENDED SAVINGS* $128,759 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $117,929
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas LPG Water Disposal Solid Waste (non-haz) Personnel Changes Ancillary Material Cost Water Consumption Electricity Usage Electricity Demand Natural Gas LPG Water Disposal Solid Waste (non-haz) Personnel Changes Ancillary Material Cost Water Consumption
$ kWh $ kW-months/year $ MMBtu $ MMBtu $ Tgal $ lb $ $ $ $ $ Tgal
01: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$1,097
Cost:
$1,800
$766 42,497 $331 49 - - - - - - - - - - - - - - $766
42,497
kWh
$331
49
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
Tgal
-
-
lb
-
-
$
-
-
$
-
-
Tgal
02: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$2,210
Cost:
$1,910
- - - - $1,692 651 $518 49 - - - - - - - - - - -
-
kWh
-
-
kW-months/year
$1,692
651
MMBtu
$518
49
MMBtu
-
-
Tgal
-
-
lb
-
-
$
-
-
$
-
-
Tgal
03: 2.2514 COVER OPEN TANKS Savings:
$634
Cost:
$242
- - - - $634 217 - - - - - - - - - - - - -
-
kWh
-
-
kW-months/year
$634
217
MMBtu
-
-
MMBtu
-
-
Tgal
-
-
lb
-
-
$
-
-
$
-
-
Tgal
04: 2.2628 UTILIZE A LESS EXPENSIVE COOLING METHOD Savings:
$16,937
Cost:
$20,000
$(-1,092) (-60,668) $(-853) (-127) - - - - $13,342 8,777,520 - - - - - - $5,540 - $(-1,092)
(-60,668)
kWh
$(-853)
(-127)
kW-months/year
-
-
MMBtu
-
-
MMBtu
$13,342
8,777,520
Tgal
-
-
lb
-
-
$
-
-
$
$5,540
-
Tgal
05: 3.6192 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL Savings:
$10,196
Cost:
$32,400
$(-405) (-22,567) $(-3,443) (-512) - - - - - - $16,384 65,800 $(-2,340) - - - - - $(-405)
(-22,567)
kWh
$(-3,443)
(-512)
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
Tgal
$16,384
65,800
lb
$(-2,340)
-
$
-
-
$
-
-
Tgal
06: 3.4116 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) Savings:
$13,735
Cost:
$9,500
- - - - - - - - $13,735 9,036,000 - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
MMBtu
$13,735
9,036,000
Tgal
-
-
lb
-
-
$
-
-
$
-
-
Tgal
07: 2.1335 REPLACE GASOLINE WITH DIESEL, LPG, OR NATURAL GAS Savings:
$13,750
Cost:
$19,000
- - - - - - - - - - - - - - $13,750 - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
Tgal
-
-
lb
-
-
$
$13,750
-
$
-
-
Tgal
08: 4.514 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE HANDLING COSTS Savings:
$70,200
Cost:
$65,000
- - - - - - - - - - - - $70,200 - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
Tgal
-
-
lb
$70,200
-
$
-
-
$
-
-
Tgal
TOTAL RECOMMENDED Savings:
$128,759
Cost:
$149,852
$(-731) (-40,738) $(-3,965) (-590) $2,326 868 $518 49 $27,077 17,813,520 $16,384 65,800 $67,860 - $13,750 - $5,540 - $(-731)
(-40,738)
kWh
$(-3,965)
(-590)
kW-months/year
$2,326
868
MMBtu
$518
49
MMBtu
$27,077
17,813,520
Tgal
$16,384
65,800
lb
$67,860
-
$
$13,750
-
$
$5,540
-
Tgal
TOTAL IMPLEMENTED Savings:
$117,929
Cost:
$117,210
$(-326) (-18,171) $(-522) (-78) $1,692 651 $518 49 $27,077 17,813,520 - - $70,200 - $13,750 - $5,540 - $(-326)
(-18,171)
kWh
$(-522)
(-78)
kW-months/year
$1,692
651
MMBtu
$518
49
MMBtu
$27,077
17,813,520
Tgal
-
-
lb
$70,200
-
$
$13,750
-
$
$5,540
-
Tgal
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ MMBtu $ Tgal $ lb $ $ $ $ $ Tgal
Electricity Usage Electricity Demand Natural Gas LPG Water Disposal Solid Waste (non-haz) Personnel Changes Ancillary Material Cost Water Consumption Electricity Usage Electricity Demand Natural Gas LPG Water Disposal Solid Waste (non-haz) Personnel Changes Ancillary Material Cost Water Consumption