IAC logo
IAC Assessment: DS0092
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: DS0092
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center South Dakota State
Assessment Year 1997
Principal Product Metal Fabricated Products
NAICS n/a
SIC 3312 - Blast Furnaces And Steel Mills
Sales $1,000,000-$5,000,000
# of Employees 45
Plant Area (Sq.Ft.) 95,000
Annual Production 9,000 Tons
Production Hrs. Annual 4,940
Location (State) MN
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $38,314 1,163,540 kWh $0.03
Electricity Demand $36,648 4,896 kW-months/year $7.49
Electricity Fees $11,779 - $ -
Natural Gas $9,870 3,653 MMBtu $2.70
LPG $6,594 734 MMBtu $8.98
TOTAL ENERGY COSTS $114,233
RECOMMENDED SAVINGS* $21,350 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $15,656
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Other Liquid (haz) Solid Waste (non-haz) Administrative Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Other Liquid (haz) Solid Waste (non-haz) Administrative Changes Ancillary Material Cost
$ kWh $ kW-months/year $ MMBtu $ gal $ lb $ $ $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,439
Cost:
$2,055
$801 24,326 $638 85 - - - - - - - - - - $801
24,326
kWh
$638
85
kW-months/year
-
-
MMBtu
-
-
gal
-
-
lb
-
-
$
-
-
$
02: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$327
Cost:
$280
$255 7,620 $72 10 - - - - - - - - - - $255
7,620
kWh
$72
10
kW-months/year
-
-
MMBtu
-
-
gal
-
-
lb
-
-
$
-
-
$
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$134
Cost:
$182
$105 17,292 $29 4 - - - - - - - - - - $105
17,292
kWh
$29
4
kW-months/year
-
-
MMBtu
-
-
gal
-
-
lb
-
-
$
-
-
$
04: 2.7491 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS Savings:
$1,905
Cost:
$2,100
- - - - $1,905 706 - - - - - - - - -
-
kWh
-
-
kW-months/year
$1,905
706
MMBtu
-
-
gal
-
-
lb
-
-
$
-
-
$
05: 3.2123 CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS Savings:
$2,123
Cost:
$700
- - - - - - $341 62 - - - - $1,782 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$341
62
gal
-
-
lb
-
-
$
$1,782
-
$
06: 3.7131 USE A RAG RECYCLE SERVICE Savings:
$227
Cost:
$750
- - - - - - - - $227 3,600 - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
gal
$227
3,600
lb
-
-
$
-
-
$
07: 4.515 INSTALL SHELVES / RACKS TO UTILIZE UNUSED SPACE Savings:
$12,302
Cost:
$5,500
- - - - - - - - - - $12,302 - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
gal
-
-
lb
$12,302
-
$
-
-
$
08: 2.8121 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES Savings:
$2,893
Cost:
$360
- - - - - - - - - - $2,893 - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
gal
-
-
lb
$2,893
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$21,350
Cost:
$11,927
$1,161 49,238 $739 99 $1,905 706 $341 62 $227 3,600 $15,195 - $1,782 - $1,161
49,238
kWh
$739
99
kW-months/year
$1,905
706
MMBtu
$341
62
gal
$227
3,600
lb
$15,195
-
$
$1,782
-
$
TOTAL IMPLEMENTED Savings:
$15,656
Cost:
$6,322
$360 24,912 $101 14 - - - - - - $15,195 - - - $360
24,912
kWh
$101
14
kW-months/year
-
-
MMBtu
-
-
gal
-
-
lb
$15,195
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ gal $ lb $ $ $ $
Electricity Usage Electricity Demand Natural Gas Other Liquid (haz) Solid Waste (non-haz) Administrative Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Other Liquid (haz) Solid Waste (non-haz) Administrative Changes Ancillary Material Cost