IAC logo
IAC Assessment: DS0098
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: DS0098
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center South Dakota State
Assessment Year 1997
Principal Product Carrier Tape
NAICS n/a
SIC 3559 - Special Industry Machinery, Nec
Sales $100,000,000-$500,000,000
# of Employees 450
Plant Area (Sq.Ft.) 93,000
Annual Production 1,194,226 Thousand Feet
Production Hrs. Annual 8,736
Location (State) MN
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $121,661 4,189,918 kWh $0.03
Electricity Demand $59,046 7,800 kW-months/year $7.57
Electricity Fees $12,014 - $ -
Natural Gas $10,917 1,976 MMBtu $5.52
TOTAL ENERGY COSTS $209,129
RECOMMENDED SAVINGS* $16,398 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $15,675
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Solid Waste (non-haz) Personnel Changes Electricity Usage Electricity Demand Solid Waste (non-haz) Personnel Changes
$ kWh $ kW-months/year $ lb $ $
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,701
Cost:
$50
$1,438 49,531 $263 35 - - - - $1,438
49,531
kWh
$263
35
kW-months/year
-
-
lb
-
-
$
02: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$13,974
Cost:
$9,200
$10,220 352,579 $3,754 496 - - - - $10,220
352,579
kWh
$3,754
496
kW-months/year
-
-
lb
-
-
$
03: 3.5316 CONTRACT A WOOD PALLET RECYCLING COMPANY Savings:
$125
Cost:
$100
- - - - $125 - - - -
-
kWh
-
-
kW-months/year
$125
-
lb
-
-
$
04: 3.1191 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS Savings:
$598
Cost:
-
- - - - - - $598 - -
-
kWh
-
-
kW-months/year
-
-
lb
$598
-
$
TOTAL RECOMMENDED Savings:
$16,398
Cost:
$9,350
$11,658 402,110 $4,017 531 $125 - $598 - $11,658
402,110
kWh
$4,017
531
kW-months/year
$125
-
lb
$598
-
$
TOTAL IMPLEMENTED Savings:
$15,675
Cost:
$9,250
$11,658 402,110 $4,017 531 - - - - $11,658
402,110
kWh
$4,017
531
kW-months/year
-
-
lb
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ lb $ $
Electricity Usage Electricity Demand Solid Waste (non-haz) Personnel Changes Electricity Usage Electricity Demand Solid Waste (non-haz) Personnel Changes