IAC logo
IAC Assessment: DS0101
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: DS0101
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center South Dakota State
Assessment Year 1998
Principal Product Beef Products
NAICS n/a
SIC 2011 - Meat Packing Plants
Sales $100,000,000-$500,000,000
# of Employees 354
Plant Area (Sq.Ft.) 62,552
Annual Production 394,570 Pieces
Production Hrs. Annual 4,420
Location (State) MN
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $290,029 12,349,355 kWh $0.02
Electricity Demand $192,427 24,552 kW-months/year $7.84
Electricity Fees $4,658 - $ -
Natural Gas $401,505 132,907 MMBtu $3.02
TOTAL ENERGY COSTS $1,034,364
RECOMMENDED SAVINGS* $14,207 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Water Disposal Personnel Changes Water Consumption Electricity Usage Electricity Demand Natural Gas Water Disposal Personnel Changes Water Consumption
$ kWh $ kW-months/year $ MMBtu $ Tgal $ $ $ Tgal
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,339
Cost:
$10,895
$1,257 54,807 $1,082 138 - - - - - - - - $1,257
54,807
kWh
$1,082
138
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
-
-
Tgal
02: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$1,905
Cost:
$1,750
$1,011 43,962 $894 114 - - - - - - - - $1,011
43,962
kWh
$894
114
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
-
-
Tgal
03: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$1,424
Cost:
$820
$(-36) (-1,465) $(-38) (-5) $1,498 496 - - - - - - $(-36)
(-1,465)
kWh
$(-38)
(-5)
kW-months/year
$1,498
496
MMBtu
-
-
Tgal
-
-
$
-
-
Tgal
04: 3.4151 MINIMIZE WATER USAGE Savings:
$2,739
Cost:
-
- - - - - - $1,074 1,342,688 - - $1,665 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$1,074
1,342,688
Tgal
-
-
$
$1,665
-
Tgal
05: 3.4151 MINIMIZE WATER USAGE Savings:
$5,125
Cost:
$(-6,000)
$(-66) (-2,931) $(-245) (-31) - - $2,132 2,664,544 - - $3,304 - $(-66)
(-2,931)
kWh
$(-245)
(-31)
kW-months/year
-
-
MMBtu
$2,132
2,664,544
Tgal
-
-
$
$3,304
-
Tgal
06: 3.1131 USE MECHANICAL STRIPPING METHODS Savings:
$675
Cost:
$2,295
- - - - - - - - $675 - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
$675
-
$
-
-
Tgal
TOTAL RECOMMENDED Savings:
$14,207
Cost:
$9,760
$2,166 94,373 $1,693 216 $1,498 496 $3,206 4,007,232 $675 - $4,969 - $2,166
94,373
kWh
$1,693
216
kW-months/year
$1,498
496
MMBtu
$3,206
4,007,232
Tgal
$675
-
$
$4,969
-
Tgal
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
-
-
Tgal
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ Tgal $ $ $ Tgal
Electricity Usage Electricity Demand Natural Gas Water Disposal Personnel Changes Water Consumption Electricity Usage Electricity Demand Natural Gas Water Disposal Personnel Changes Water Consumption