IAC logo
IAC Assessment: DS0104
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: DS0104
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center South Dakota State
Assessment Year 1998
Principal Product Window and Door Hardware
NAICS n/a
SIC 3429 - Hardware, Nec
Sales $50,000,000-$100,000,000
# of Employees 495
Plant Area (Sq.Ft.) 200,000
Annual Production 132,000,000 Pieces
Production Hrs. Annual 6,240
Location (State) MN
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $274,377 10,639,215 kWh $0.03
Electricity Demand $217,549 18,348 kW-months/year $11.86
Electricity Fees $22,273 - $ -
Natural Gas $126,935 58,427 MMBtu $2.17
LPG $34,389 2,547 MMBtu $13.50
TOTAL ENERGY COSTS $724,617
RECOMMENDED SAVINGS* $33,618 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $6,259
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Solid Waste (non-haz) Administrative Changes Electricity Usage Electricity Demand Solid Waste (non-haz) Administrative Changes
$ kWh $ kW-months/year $ lb $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$5,845
Cost:
$12,803
$3,112 119,871 $2,733 230 - - - - $3,112
119,871
kWh
$2,733
230
kW-months/year
-
-
lb
-
-
$
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$488
Cost:
$156
$260 9,965 $228 19 - - - - $260
9,965
kWh
$228
19
kW-months/year
-
-
lb
-
-
$
03: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$2,584
Cost:
$822
$1,759 67,702 $825 70 - - - - $1,759
67,702
kWh
$825
70
kW-months/year
-
-
lb
-
-
$
04: 3.5316 CONTRACT A WOOD PALLET RECYCLING COMPANY Savings:
$15,180
Cost:
$160
- - - - $15,180 - - - -
-
kWh
-
-
kW-months/year
$15,180
-
lb
-
-
$
05: 3.7214 REDUCE OR ELIMINATE WASTE Savings:
$5,771
Cost:
$1,510
- - - - $5,771 6,000 - - -
-
kWh
-
-
kW-months/year
$5,771
6,000
lb
-
-
$
06: 3.1175 USE A DIFFERENT OR RECYCLED RAW MATERIAL Savings:
$3,750
Cost:
$160
- - - - - - $3,750 - -
-
kWh
-
-
kW-months/year
-
-
lb
$3,750
-
$
TOTAL RECOMMENDED Savings:
$33,618
Cost:
$15,611
$5,131 197,538 $3,786 319 $20,951 6,000 $3,750 - $5,131
197,538
kWh
$3,786
319
kW-months/year
$20,951
6,000
lb
$3,750
-
$
TOTAL IMPLEMENTED Savings:
$6,259
Cost:
$1,666
$260 9,965 $228 19 $5,771 6,000 - - $260
9,965
kWh
$228
19
kW-months/year
$5,771
6,000
lb
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ lb $ $
Electricity Usage Electricity Demand Solid Waste (non-haz) Administrative Changes Electricity Usage Electricity Demand Solid Waste (non-haz) Administrative Changes