Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | South Dakota State |
---|---|
Assessment Year | 1998 |
Principal Product | Window and Door Hardware |
NAICS | n/a |
SIC | 3429 - Hardware, Nec |
Sales | $50,000,000-$100,000,000 |
# of Employees | 495 |
Plant Area (Sq.Ft.) | 200,000 |
Annual Production | 132,000,000 Pieces |
Production Hrs. Annual | 6,240 |
Location (State) | MN |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $274,377 | 10,639,215 | kWh | $0.03 |
Electricity Demand | $217,549 | 18,348 | kW-months/year | $11.86 |
Electricity Fees | $22,273 | - | $ | - |
Natural Gas | $126,935 | 58,427 | MMBtu | $2.17 |
LPG | $34,389 | 2,547 | MMBtu | $13.50 |
TOTAL ENERGY COSTS | $724,617 | |||
RECOMMENDED SAVINGS* | $33,618 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $6,259 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Solid Waste (non-haz) | Administrative Changes | Electricity Usage | Electricity Demand | Solid Waste (non-haz) | Administrative Changes | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | lb | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $5,845 Cost: $12,803 |
$3,112 | 119,871 | $2,733 | 230 | - | - | - | - |
$3,112 119,871 kWh |
$2,733 230 kW-months/year |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $488 Cost: $156 |
$260 | 9,965 | $228 | 19 | - | - | - | - |
$260 9,965 kWh |
$228 19 kW-months/year |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE |
Savings: $2,584 Cost: $822 |
$1,759 | 67,702 | $825 | 70 | - | - | - | - |
$1,759 67,702 kWh |
$825 70 kW-months/year |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 3.5316 CONTRACT A WOOD PALLET RECYCLING COMPANY |
Savings: $15,180 Cost: $160 |
- | - | - | - | $15,180 | - | - | - |
- - kWh |
- - kW-months/year |
$15,180 - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 3.7214 REDUCE OR ELIMINATE WASTE |
Savings: $5,771 Cost: $1,510 |
- | - | - | - | $5,771 | 6,000 | - | - |
- - kWh |
- - kW-months/year |
$5,771 6,000 lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 3.1175 USE A DIFFERENT OR RECYCLED RAW MATERIAL |
Savings: $3,750 Cost: $160 |
- | - | - | - | - | - | $3,750 | - |
- - kWh |
- - kW-months/year |
- - lb |
$3,750 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $33,618 Cost: $15,611 |
$5,131 | 197,538 | $3,786 | 319 | $20,951 | 6,000 | $3,750 | - | $5,131 197,538 kWh |
$3,786 319 kW-months/year |
$20,951 6,000 lb |
$3,750 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $6,259 Cost: $1,666 |
$260 | 9,965 | $228 | 19 | $5,771 | 6,000 | - | - | $260 9,965 kWh |
$228 19 kW-months/year |
$5,771 6,000 lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | lb | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Solid Waste (non-haz) | Administrative Changes | Electricity Usage | Electricity Demand | Solid Waste (non-haz) | Administrative Changes |