Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | South Dakota State |
---|---|
Assessment Year | 1998 |
Principal Product | Waterbase and Hot Melt Adhesives |
NAICS | n/a |
SIC | 2891 - Adhesives And Sealants |
Sales | $10,000,000-$50,000,000 |
# of Employees | 43 |
Plant Area (Sq.Ft.) | 54,259 |
Annual Production | 21,600,000 Pounds |
Production Hrs. Annual | 7,150 |
Location (State) | MN |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $57,953 | 1,897,128 | kWh | $0.03 |
Electricity Demand | $33,165 | 4,368 | kW-months/year | $7.59 |
Electricity Fees | $10,361 | - | $ | - |
Natural Gas | $73,600 | 18,451 | MMBtu | $3.99 |
TOTAL ENERGY COSTS | $221,092 | |||
RECOMMENDED SAVINGS* | $28,131 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $12,472 |
#|Description |
Savings Cost |
Status | Natural Gas | Water Disposal | Solid Waste (non-haz) | Administrative Changes | Primary Raw Material | Water Consumption | Natural Gas | Water Disposal | Solid Waste (non-haz) | Administrative Changes | Primary Raw Material | Water Consumption | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | MMBtu | $ | Tgal | $ | lb | $ | $ | $ | $ | $ | Tgal | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.2511 INSULATE BARE EQUIPMENT |
Savings: $3,231 Cost: $2,430 |
$3,231 | 810 | - | - | - | - | - | - | - | - | - | - |
$3,231 810 MMBtu |
- - Tgal |
- - lb |
- - $ |
- - $ |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.2135 REPAIR AND ELIMINATE STEAM LEAKS |
Savings: $1,009 Cost: $400 |
$877 | 220 | $104 | 16,175 | - | - | - | - | - | - | $28 | - |
$877 220 MMBtu |
$104 16,175 Tgal |
- - lb |
- - $ |
- - $ |
$28 - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 3.1191 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS |
Savings: $15,659 Cost: $199 |
- | - | $8,545 | 13,325 | - | - | - | - | $7,114 | - | - | - |
- - MMBtu |
$8,545 13,325 Tgal |
- - lb |
- - $ |
$7,114 - $ |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 3.5316 CONTRACT A WOOD PALLET RECYCLING COMPANY |
Savings: $4,680 Cost: $160 |
- | - | - | - | - | - | $4,680 | - | - | - | - | - |
- - MMBtu |
- - Tgal |
- - lb |
$4,680 - $ |
- - $ |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 3.5315 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER |
Savings: $3,552 Cost: $4,750 |
- | - | - | - | $3,552 | 57,800 | - | - | - | - | - | - |
- - MMBtu |
- - Tgal |
$3,552 57,800 lb |
- - $ |
- - $ |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $28,131 Cost: $7,939 |
$4,108 | 1,030 | $8,649 | 29,500 | $3,552 | 57,800 | $4,680 | - | $7,114 | - | $28 | - | $4,108 1,030 MMBtu |
$8,649 29,500 Tgal |
$3,552 57,800 lb |
$4,680 - $ |
$7,114 - $ |
$28 - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $12,472 Cost: $7,740 |
$4,108 | 1,030 | $104 | 16,175 | $3,552 | 57,800 | $4,680 | - | - | - | $28 | - | $4,108 1,030 MMBtu |
$104 16,175 Tgal |
$3,552 57,800 lb |
$4,680 - $ |
- - $ |
$28 - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | MMBtu | $ | Tgal | $ | lb | $ | $ | $ | $ | $ | Tgal | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Natural Gas | Water Disposal | Solid Waste (non-haz) | Administrative Changes | Primary Raw Material | Water Consumption | Natural Gas | Water Disposal | Solid Waste (non-haz) | Administrative Changes | Primary Raw Material | Water Consumption |