IAC Assessment: DS0106
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: DS0106
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center South Dakota State
Assessment Year 1998
Principal Product Waterbase and Hot Melt Adhesives
NAICS n/a
SIC 2891 - Adhesives And Sealants
Sales $10,000,000-$50,000,000
# of Employees 43
Plant Area (Sq.Ft.) 54,259
Annual Production 21,600,000 Pounds
Production Hrs. Annual 7,150
Location (State) MN
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $57,953 1,897,128 kWh $0.03
Electricity Demand $33,165 4,368 kW-months/year $7.59
Electricity Fees $10,361 - $ -
Natural Gas $73,600 18,451 MMBtu $3.99
TOTAL ENERGY COSTS $221,092
RECOMMENDED SAVINGS* $28,131 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $12,472
#|Description Savings
Cost
Status Natural Gas Water Disposal Solid Waste (non-haz) Administrative Changes Primary Raw Material Water Consumption Natural Gas Water Disposal Solid Waste (non-haz) Administrative Changes Primary Raw Material Water Consumption
$ MMBtu $ Tgal $ lb $ $ $ $ $ Tgal
01: 2.2511 INSULATE BARE EQUIPMENT Savings:
$3,231
Cost:
$2,430
$3,231 810 - - - - - - - - - - $3,231
810
MMBtu
-
-
Tgal
-
-
lb
-
-
$
-
-
$
-
-
Tgal
02: 2.2135 REPAIR AND ELIMINATE STEAM LEAKS Savings:
$1,009
Cost:
$400
$877 220 $104 16,175 - - - - - - $28 - $877
220
MMBtu
$104
16,175
Tgal
-
-
lb
-
-
$
-
-
$
$28
-
Tgal
03: 3.1191 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS Savings:
$15,659
Cost:
$199
- - $8,545 13,325 - - - - $7,114 - - - -
-
MMBtu
$8,545
13,325
Tgal
-
-
lb
-
-
$
$7,114
-
$
-
-
Tgal
04: 3.5316 CONTRACT A WOOD PALLET RECYCLING COMPANY Savings:
$4,680
Cost:
$160
- - - - - - $4,680 - - - - - -
-
MMBtu
-
-
Tgal
-
-
lb
$4,680
-
$
-
-
$
-
-
Tgal
05: 3.5315 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER Savings:
$3,552
Cost:
$4,750
- - - - $3,552 57,800 - - - - - - -
-
MMBtu
-
-
Tgal
$3,552
57,800
lb
-
-
$
-
-
$
-
-
Tgal
TOTAL RECOMMENDED Savings:
$28,131
Cost:
$7,939
$4,108 1,030 $8,649 29,500 $3,552 57,800 $4,680 - $7,114 - $28 - $4,108
1,030
MMBtu
$8,649
29,500
Tgal
$3,552
57,800
lb
$4,680
-
$
$7,114
-
$
$28
-
Tgal
TOTAL IMPLEMENTED Savings:
$12,472
Cost:
$7,740
$4,108 1,030 $104 16,175 $3,552 57,800 $4,680 - - - $28 - $4,108
1,030
MMBtu
$104
16,175
Tgal
$3,552
57,800
lb
$4,680
-
$
-
-
$
$28
-
Tgal
Savings
Cost
$ MMBtu $ Tgal $ lb $ $ $ $ $ Tgal
Natural Gas Water Disposal Solid Waste (non-haz) Administrative Changes Primary Raw Material Water Consumption Natural Gas Water Disposal Solid Waste (non-haz) Administrative Changes Primary Raw Material Water Consumption