Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | South Dakota State |
---|---|
Assessment Year | 1998 |
Principal Product | Cheese and Whey |
NAICS | n/a |
SIC | 2022 - Cheese, Natural And Processed |
Sales | $50,000,000-$100,000,000 |
# of Employees | 170 |
Plant Area (Sq.Ft.) | 200,000 |
Annual Production | 65,120,000 Pounds |
Production Hrs. Annual | 8,736 |
Location (State) | MN |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $494,769 | 17,177,023 | kWh | $0.03 |
Electricity Demand | $180,778 | 26,976 | kW-months/year | $6.70 |
Electricity Fees | $2,642 | - | $ | - |
Natural Gas | $709,996 | 261,306 | MMBtu | $2.72 |
TOTAL ENERGY COSTS | $2,040,019 | |||
RECOMMENDED SAVINGS* | $424,398 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $417,297 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Solid Waste (non-haz) | Personnel Changes | Administrative Changes | Electricity Usage | Electricity Demand | Natural Gas | Solid Waste (non-haz) | Personnel Changes | Administrative Changes | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | lb | $ | $ | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $3,776 Cost: $13,369 |
$2,699 | 93,200 | $1,077 | 161 | - | - | - | - | - | - | - | - |
$2,699 93,200 kWh |
$1,077 161 kW-months/year |
- - MMBtu |
- - lb |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS |
Savings: $1,907 Cost: $1,500 |
$1,203 | 41,618 | $704 | 105 | - | - | - | - | - | - | - | - |
$1,203 41,618 kWh |
$704 105 kW-months/year |
- - MMBtu |
- - lb |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.2444 USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS |
Savings: $10,041 Cost: $13,000 |
- | - | - | - | $10,041 | 3,719 | - | - | - | - | - | - |
- - kWh |
- - kW-months/year |
$10,041 3,719 MMBtu |
- - lb |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 3.5316 CONTRACT A WOOD PALLET RECYCLING COMPANY |
Savings: $250 Cost: $250 |
- | - | - | - | - | - | - | - | - | - | $250 | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
- - lb |
- - $ |
$250 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 4.114 ADD/MODIFY EQUIPMENT TO IMPROVE DRYING PROCESS |
Savings: $4,740 Cost: $1,500 |
- | - | - | - | - | - | $4,740 | 25,020 | - | - | - | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
$4,740 25,020 lb |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 3.6192 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL |
Savings: $3,325 Cost: $50 |
- | - | - | - | - | - | $3,325 | 20,000 | - | - | - | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
$3,325 20,000 lb |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 4.441 INSTALL AUTOMATIC PACKING EQUIPMENT |
Savings: $400,359 Cost: $200,000 |
$(-661) | (-22,860) | $(-420) | (-63) | - | - | - | - | $401,440 | - | - | - |
$(-661) (-22,860) kWh |
$(-420) (-63) kW-months/year |
- - MMBtu |
- - lb |
$401,440 - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $424,398 Cost: $229,669 |
$3,241 | 111,958 | $1,361 | 203 | $10,041 | 3,719 | $8,065 | 45,020 | $401,440 | - | $250 | - | $3,241 111,958 kWh |
$1,361 203 kW-months/year |
$10,041 3,719 MMBtu |
$8,065 45,020 lb |
$401,440 - $ |
$250 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $417,297 Cost: $216,250 |
$542 | 18,758 | $284 | 42 | $10,041 | 3,719 | $4,740 | 25,020 | $401,440 | - | $250 | - | $542 18,758 kWh |
$284 42 kW-months/year |
$10,041 3,719 MMBtu |
$4,740 25,020 lb |
$401,440 - $ |
$250 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | lb | $ | $ | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Solid Waste (non-haz) | Personnel Changes | Administrative Changes | Electricity Usage | Electricity Demand | Natural Gas | Solid Waste (non-haz) | Personnel Changes | Administrative Changes |