Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center South Dakota State
Assessment Year 1998
Principal Product Cheese and Whey
NAICS n/a
SIC 2022 - Cheese, Natural And Processed
Sales $10,000,000-$50,000,000
# of Employees 94
Plant Area (Sq.Ft.) 93,875
Annual Production 50,700,000 Pounds
Production Hrs. Annual 6,240
Location (State) MN
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $403,331 13,816,823 kWh $0.03
Electricity Demand $199,836 28,416 kW-months/year $7.03
Electricity Fees $(-31,150) - $ -
Natural Gas $440,121 137,978 MMBtu $3.19
Fuel Oil #6 $187,910 58,685 MMBtu $3.20
TOTAL ENERGY COSTS $1,422,890
RECOMMENDED SAVINGS* $44,635 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $8,807
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Fuel Oil #6 Water Disposal Administrative Changes Water Consumption Electricity Usage Electricity Demand Natural Gas Fuel Oil #6 Water Disposal Administrative Changes Water Consumption
$ kWh $ kW-months/year $ MMBtu $ MMBtu $ Tgal $ $ $ Tgal
01: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$1,323
Cost:
-
$1,323 45,721 - - - - - - - - - - - - $1,323
45,721
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
Tgal
-
-
$
-
-
Tgal
02: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$985
Cost:
$1,000
$740 25,498 $245 35 - - - - - - - - - - $740
25,498
kWh
$245
35
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
Tgal
-
-
$
-
-
Tgal
03: 2.1213 DIRECT WARMEST AIR TO COMBUSTION INTAKE Savings:
$6,912
Cost:
$2,400
- - - - $4,653 1,454 $2,259 706 - - - - - - -
-
kWh
-
-
kW-months/year
$4,653
1,454
MMBtu
$2,259
706
MMBtu
-
-
Tgal
-
-
$
-
-
Tgal
04: 2.2628 UTILIZE A LESS EXPENSIVE COOLING METHOD Savings:
$14,505
Cost:
$15,260
$(-832) (-28,722) $(-388) (-55) - - - - $9,435 6,289,920 - - $6,290 - $(-832)
(-28,722)
kWh
$(-388)
(-55)
kW-months/year
-
-
MMBtu
-
-
MMBtu
$9,435
6,289,920
Tgal
-
-
$
$6,290
-
Tgal
05: 3.5315 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER Savings:
$910
Cost:
$200
- - - - - - - - - - $910 - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
Tgal
$910
-
$
-
-
Tgal
06: 3.1191 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS Savings:
$20,000
Cost:
$1,000
- - - - - - - - - - $20,000 - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
Tgal
$20,000
-
$
-
-
Tgal
TOTAL RECOMMENDED Savings:
$44,635
Cost:
$19,860
$1,231 42,497 $(-143) (-20) $4,653 1,454 $2,259 706 $9,435 6,289,920 $20,910 - $6,290 - $1,231
42,497
kWh
$(-143)
(-20)
kW-months/year
$4,653
1,454
MMBtu
$2,259
706
MMBtu
$9,435
6,289,920
Tgal
$20,910
-
$
$6,290
-
Tgal
TOTAL IMPLEMENTED Savings:
$8,807
Cost:
$3,600
$740 25,498 $245 35 $4,653 1,454 $2,259 706 - - $910 - - - $740
25,498
kWh
$245
35
kW-months/year
$4,653
1,454
MMBtu
$2,259
706
MMBtu
-
-
Tgal
$910
-
$
-
-
Tgal
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ MMBtu $ Tgal $ $ $ Tgal
Electricity Usage Electricity Demand Natural Gas Fuel Oil #6 Water Disposal Administrative Changes Water Consumption Electricity Usage Electricity Demand Natural Gas Fuel Oil #6 Water Disposal Administrative Changes Water Consumption