IAC logo
IAC Assessment: DS0120
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: DS0120
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center South Dakota State
Assessment Year 1998
Principal Product Wire Fixtures and Displays
NAICS n/a
SIC 3490 -
Sales $10,000,000-$50,000,000
# of Employees 200
Plant Area (Sq.Ft.) 140,000
Annual Production 1,200,000 Pounds
Production Hrs. Annual 6,240
Location (State) MN
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $71,155 1,995,897 kWh $0.04
Electricity Demand $37,715 4,980 kW-months/year $7.57
Electricity Fees $(-1,647) - $ -
Natural Gas $55,682 12,378 MMBtu $4.50
LPG $11,050 957 MMBtu $11.55
TOTAL ENERGY COSTS $186,237
RECOMMENDED SAVINGS* $19,667 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Solid Waste (non-haz) Personnel Changes Administrative Changes Primary Raw Material Electricity Usage Electricity Demand Solid Waste (non-haz) Personnel Changes Administrative Changes Primary Raw Material
$ kWh $ kW-months/year $ lb $ $ $ $ $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$5,333
Cost:
$13,988
$3,787 105,217 $1,546 204 - - - - - - - - $3,787
105,217
kWh
$1,546
204
kW-months/year
-
-
lb
-
-
$
-
-
$
-
-
$
02: 3.5316 CONTRACT A WOOD PALLET RECYCLING COMPANY Savings:
$1,630
Cost:
$160
- - - - - - - - $1,630 - - - -
-
kWh
-
-
kW-months/year
-
-
lb
-
-
$
$1,630
-
$
-
-
$
03: 3.5315 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER Savings:
$4,579
Cost:
$4,750
- - - - $4,195 12,200 $(-104) - $488 - - - -
-
kWh
-
-
kW-months/year
$4,195
12,200
lb
$(-104)
-
$
$488
-
$
-
-
$
04: 3.2176 INCREASE USE OF AUTOMATION Savings:
$2,600
Cost:
$4,900
- - - - - - $2,600 - - - - - -
-
kWh
-
-
kW-months/year
-
-
lb
$2,600
-
$
-
-
$
-
-
$
05: 4.2110 CONSIDER USE / PURCHASE OF BULK MATERIALS WHERE POSSIBLE Savings:
$5,525
Cost:
$1,350
- - - - - - - - - - $5,525 - -
-
kWh
-
-
kW-months/year
-
-
lb
-
-
$
-
-
$
$5,525
-
$
TOTAL RECOMMENDED Savings:
$19,667
Cost:
$25,148
$3,787 105,217 $1,546 204 $4,195 12,200 $2,496 - $2,118 - $5,525 - $3,787
105,217
kWh
$1,546
204
kW-months/year
$4,195
12,200
lb
$2,496
-
$
$2,118
-
$
$5,525
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
lb
-
-
$
-
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ lb $ $ $ $ $ $
Electricity Usage Electricity Demand Solid Waste (non-haz) Personnel Changes Administrative Changes Primary Raw Material Electricity Usage Electricity Demand Solid Waste (non-haz) Personnel Changes Administrative Changes Primary Raw Material