IAC logo
IAC Assessment: DS0126
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: DS0126
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center South Dakota State
Assessment Year 1999
Principal Product Automated Packaging Equipment
NAICS n/a
SIC 3471 - Plating And Polishing
Sales $50,000,000-$100,000,000
# of Employees 550
Plant Area (Sq.Ft.) 220,000
Annual Production 300 Pieces
Production Hrs. Annual 6,240
Location (State) MN
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $243,638 5,947,245 kWh $0.04
Electricity Demand $33,277 16,344 kW-months/year $2.04
Electricity Fees $4,884 - $ -
Natural Gas $86,330 16,974 MMBtu $5.09
TOTAL ENERGY COSTS $392,164
RECOMMENDED SAVINGS* $98,385 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $86,371
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Administrative Changes Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Administrative Changes
$ kWh $ kW-months/year $ MMBtu $ lb $ $
01: 3.5316 CONTRACT A WOOD PALLET RECYCLING COMPANY Savings:
$1,040
Cost:
$160
- - - - - - $1,040 - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$1,040
-
lb
-
-
$
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,141
Cost:
$20
$1,090 26,671 $51 25 - - - - - - $1,090
26,671
kWh
$51
25
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
03: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$434
Cost:
$750
$397 9,672 $37 18 - - - - - - $397
9,672
kWh
$37
18
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
04: 2.1331 BURN A LESS EXPENSIVE GRADE OF FUEL Savings:
$27,478
Cost:
$91,571
- - - - - - - - $27,478 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
$27,478
-
$
05: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$3,077
Cost:
$6,500
- - - - $3,077 586 - - - - -
-
kWh
-
-
kW-months/year
$3,077
586
MMBtu
-
-
lb
-
-
$
06: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$34,638
Cost:
$78,656
$52,600 1,283,412 $9,082 4,452 $(-27,044) (-5,151) - - - - $52,600
1,283,412
kWh
$9,082
4,452
kW-months/year
$(-27,044)
(-5,151)
MMBtu
-
-
lb
-
-
$
07: 4.211 CONSIDER USE / PURCHASE OF BULK MATERIALS WHERE POSSIBLE Savings:
$7,897
Cost:
$1,350
- - - - - - - - $7,897 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
$7,897
-
$
08: 4.424 IMPROVE SPACE COMFORT CONDITIONING Savings:
$22,680
Cost:
$270
- - - - - - - - $22,680 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
$22,680
-
$
TOTAL RECOMMENDED Savings:
$98,385
Cost:
$179,277
$54,087 1,319,755 $9,170 4,495 $(-23,967) (-4,565) $1,040 - $58,055 - $54,087
1,319,755
kWh
$9,170
4,495
kW-months/year
$(-23,967)
(-4,565)
MMBtu
$1,040
-
lb
$58,055
-
$
TOTAL IMPLEMENTED Savings:
$86,371
Cost:
$171,267
$54,087 1,319,755 $9,170 4,495 $(-27,044) (-5,151) - - $50,158 - $54,087
1,319,755
kWh
$9,170
4,495
kW-months/year
$(-27,044)
(-5,151)
MMBtu
-
-
lb
$50,158
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ lb $ $
Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Administrative Changes Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Administrative Changes