IAC logo
IAC Assessment: DS0127
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: DS0127
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center South Dakota State
Assessment Year 1999
Principal Product Quartz Crystals and Frequency Control Components
NAICS n/a
SIC 3679 - Electronic Components, Nec
Sales $10,000,000-$50,000,000
# of Employees 170
Plant Area (Sq.Ft.) 32,000
Annual Production 5,200 Pieces
Production Hrs. Annual 4,368
Location (State) SD
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $55,489 1,881,301 kWh $0.03
Electricity Demand $26,479 4,044 kW-months/year $6.55
Electricity Fees $5,327 - $ -
Natural Gas $7,193 1,448 MMBtu $4.97
TOTAL ENERGY COSTS $134,489
RECOMMENDED SAVINGS* $15,668 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $6,037
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Water Disposal Solid Waste (non-haz) Water Consumption Electricity Usage Electricity Demand Natural Gas Water Disposal Solid Waste (non-haz) Water Consumption
$ kWh $ kW-months/year $ MMBtu $ Tgal $ lb $ Tgal
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$5,707
Cost:
$13,320
$3,585 119,578 $2,122 324 - - - - - - - - $3,585
119,578
kWh
$2,122
324
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
lb
-
-
Tgal
02: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$330
Cost:
$300
$204 6,741 $126 19 - - - - - - - - $204
6,741
kWh
$126
19
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
lb
-
-
Tgal
03: 2.2511 INSULATE BARE EQUIPMENT Savings:
$883
Cost:
$692
- - - - $883 178 - - - - - - -
-
kWh
-
-
kW-months/year
$883
178
MMBtu
-
-
Tgal
-
-
lb
-
-
Tgal
04: 3.5315 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER Savings:
$1,048
Cost:
$38
- - - - - - - - $1,048 - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
$1,048
-
lb
-
-
Tgal
05: 3.4151 MINIMIZE WATER USAGE Savings:
$655
Cost:
$520
- - - - $250 50 $270 134,784 - - $135 - -
-
kWh
-
-
kW-months/year
$250
50
MMBtu
$270
134,784
Tgal
-
-
lb
$135
-
Tgal
06: 3.4111 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION Savings:
$7,045
Cost:
$20,000
$(-2,476) (-79,426) $(-1,486) (-227) - - $7,338 3,669,120 - - $3,669 - $(-2,476)
(-79,426)
kWh
$(-1,486)
(-227)
kW-months/year
-
-
MMBtu
$7,338
3,669,120
Tgal
-
-
lb
$3,669
-
Tgal
TOTAL RECOMMENDED Savings:
$15,668
Cost:
$34,870
$1,313 46,893 $762 116 $1,133 228 $7,608 3,803,904 $1,048 - $3,804 - $1,313
46,893
kWh
$762
116
kW-months/year
$1,133
228
MMBtu
$7,608
3,803,904
Tgal
$1,048
-
lb
$3,804
-
Tgal
TOTAL IMPLEMENTED Savings:
$6,037
Cost:
$13,620
$3,789 126,319 $2,248 343 - - - - - - - - $3,789
126,319
kWh
$2,248
343
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
lb
-
-
Tgal
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ Tgal $ lb $ Tgal
Electricity Usage Electricity Demand Natural Gas Water Disposal Solid Waste (non-haz) Water Consumption Electricity Usage Electricity Demand Natural Gas Water Disposal Solid Waste (non-haz) Water Consumption