IAC logo
IAC Assessment: DS0128
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: DS0128
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center South Dakota State
Assessment Year 1999
Principal Product Industrial Floor Cleaning Machines
NAICS n/a
SIC 3589 - Service Industry Machinery, Nec
Sales $50,000,000-$100,000,000
# of Employees 450
Plant Area (Sq.Ft.) 500,000
Annual Production 52,000 Pieces
Production Hrs. Annual 6,240
Location (State) MN
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $223,230 6,661,489 kWh $0.03
Electricity Demand $118,284 15,108 kW-months/year $7.83
Electricity Fees $3,490 - $ -
Natural Gas $142,217 33,727 MMBtu $4.22
TOTAL ENERGY COSTS $523,392
RECOMMENDED SAVINGS* $289,708 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $14,686
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Personnel Changes Electricity Usage Electricity Demand Natural Gas Personnel Changes
$ kWh $ kW-months/year $ MMBtu $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$14,686
Cost:
$60,411
$10,176 299,531 $4,510 576 - - - - $10,176
299,531
kWh
$4,510
576
kW-months/year
-
-
MMBtu
-
-
$
02: 2.2511 INSULATE BARE EQUIPMENT Savings:
$189
Cost:
$1,008
- - - - $189 45 - - -
-
kWh
-
-
kW-months/year
$189
45
MMBtu
-
-
$
03: 2.2314 REPLACE HEAT TREATING OVEN WITH MORE EFFICIENT UNIT Savings:
$274,833
Cost:
$125,000
- - - - $25,233 5,977 $249,600 - -
-
kWh
-
-
kW-months/year
$25,233
5,977
MMBtu
$249,600
-
$
TOTAL RECOMMENDED Savings:
$289,708
Cost:
$186,419
$10,176 299,531 $4,510 576 $25,422 6,022 $249,600 - $10,176
299,531
kWh
$4,510
576
kW-months/year
$25,422
6,022
MMBtu
$249,600
-
$
TOTAL IMPLEMENTED Savings:
$14,686
Cost:
$60,411
$10,176 299,531 $4,510 576 - - - - $10,176
299,531
kWh
$4,510
576
kW-months/year
-
-
MMBtu
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $
Electricity Usage Electricity Demand Natural Gas Personnel Changes Electricity Usage Electricity Demand Natural Gas Personnel Changes