IAC Assessment: DS0160
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: DS0160
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center South Dakota State
Assessment Year 2000
Principal Product Potato Chips, Curls, Tortilla Chips, Carmel Corn
NAICS n/a
SIC 2096 - Potato Chips And Similar Snacks
Sales $10,000,000-$50,000,000
# of Employees 220
Plant Area (Sq.Ft.) 160,370
Annual Production 45,000,000 Pounds
Production Hrs. Annual 6,240
Location (State) MN
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $137,083 4,725,967 kWh $0.03
Electricity Demand $107,950 15,888 kW-months/year $6.79
Electricity Fees $3,632 - $ -
Natural Gas $224,032 90,990 MMBtu $2.46
LPG $9,180 2,050 MMBtu $4.48
TOTAL ENERGY COSTS $681,897
RECOMMENDED SAVINGS* $139,516 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Personnel Changes Water Consumption Electricity Usage Electricity Demand Natural Gas Personnel Changes Water Consumption
$ kWh $ kW-months/year $ MMBtu $ $ $ Tgal
01: 2.6232 INSTALL SET-BACK TIMERS Savings:
$2,918
Cost:
$1,540
- - - - $2,918 782 - - - - -
-
kWh
-
-
kW-months/year
$2,918
782
MMBtu
-
-
$
-
-
Tgal
02: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$35,611
Cost:
$39,100
- - - - $35,611 14,476 - - - - -
-
kWh
-
-
kW-months/year
$35,611
14,476
MMBtu
-
-
$
-
-
Tgal
03: 2.2515 USE OPTIMUM THICKNESS INSULATION Savings:
$1,667
Cost:
$3,367
- - - - $1,667 676 - - - - -
-
kWh
-
-
kW-months/year
$1,667
676
MMBtu
-
-
$
-
-
Tgal
04: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$910
Cost:
$972
$910 31,360 - - - - - - - - $910
31,360
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
Tgal
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,312
Cost:
$7,942
$1,415 49,824 $897 112 - - - - - - $1,415
49,824
kWh
$897
112
kW-months/year
-
-
MMBtu
-
-
$
-
-
Tgal
06: 3.4111 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION Savings:
$13,111
Cost:
$3,574
- - - - - - - - $13,111 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
$13,111
-
Tgal
07: 4.441 INSTALL AUTOMATIC PACKING EQUIPMENT Savings:
$82,554
Cost:
$70,000
- - - - - - $82,554 - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$82,554
-
$
-
-
Tgal
08: 4.444 INSTALL SYSTEM TO COLLECT SCRAP Savings:
$433
Cost:
$100
- - - - - - $433 - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$433
-
$
-
-
Tgal
TOTAL RECOMMENDED Savings:
$139,516
Cost:
$126,595
$2,325 81,184 $897 112 $40,196 15,934 $82,987 - $13,111 - $2,325
81,184
kWh
$897
112
kW-months/year
$40,196
15,934
MMBtu
$82,987
-
$
$13,111
-
Tgal
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
Tgal
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ Tgal
Electricity Usage Electricity Demand Natural Gas Personnel Changes Water Consumption Electricity Usage Electricity Demand Natural Gas Personnel Changes Water Consumption