IAC logo
IAC Assessment: DS0162
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: DS0162
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center South Dakota State
Assessment Year 2000
Principal Product Animal Feed
NAICS n/a
SIC 2048 - Prepared Feeds, Nec
Sales $10,000,000-$50,000,000
# of Employees 36
Plant Area (Sq.Ft.) 20,000
Annual Production 54,000 Tons
Production Hrs. Annual 4,420
Location (State) SD
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $61,429 1,472,743 kWh $0.04
Electricity Demand $37,851 6,396 kW-months/year $5.92
Electricity Fees $14,732 - $ -
Natural Gas $17,951 6,112 MMBtu $2.94
LPG $2,114 309 MMBtu $6.84
TOTAL ENERGY COSTS $138,553
RECOMMENDED SAVINGS* $9,199 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Personnel Changes Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Personnel Changes
$ kWh $ kW-months/year $ MMBtu $ lb $ $
01: 2.2515 USE OPTIMUM THICKNESS INSULATION Savings:
$4,196
Cost:
$3,997
- - - - $4,196 1,427 - - - - -
-
kWh
-
-
kW-months/year
$4,196
1,427
MMBtu
-
-
lb
-
-
$
02: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$762
Cost:
-
- - - - $762 310 - - - - -
-
kWh
-
-
kW-months/year
$762
310
MMBtu
-
-
lb
-
-
$
03: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$1,888
Cost:
$6,600
$2,114 50,117 $405 68 $(-631) (-215) - - - - $2,114
50,117
kWh
$405
68
kW-months/year
$(-631)
(-215)
MMBtu
-
-
lb
-
-
$
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,182
Cost:
$1,702
$791 18,757 $391 66 - - - - - - $791
18,757
kWh
$391
66
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$499
Cost:
$105
$499 8,499 - - - - - - - - $499
8,499
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
06: 3.5315 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER Savings:
$252
Cost:
-
- - - - - - $252 4,800 - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$252
4,800
lb
-
-
$
07: 4.611 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE Savings:
$420
Cost:
-
- - - - - - - - $420 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
$420
-
$
TOTAL RECOMMENDED Savings:
$9,199
Cost:
$12,404
$3,404 77,373 $796 134 $4,327 1,522 $252 4,800 $420 - $3,404
77,373
kWh
$796
134
kW-months/year
$4,327
1,522
MMBtu
$252
4,800
lb
$420
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ lb $ $
Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Personnel Changes Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Personnel Changes