IAC logo
IAC Assessment: DS0163
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: DS0163
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center South Dakota State
Assessment Year 2000
Principal Product Wheelchair Lifts and Hand Controls
NAICS n/a
SIC 3559 - Special Industry Machinery, Nec
Sales $10,000,000-$50,000,000
# of Employees 90
Plant Area (Sq.Ft.) 36,800
Annual Production 12,550 Pieces
Production Hrs. Annual 5,616
Location (State) MN
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $19,302 622,802 kWh $0.03
Electricity Demand $16,396 2,160 kW-months/year $7.59
Electricity Fees $5,208 - $ -
LPG $16,732 2,836 MMBtu $5.90
TOTAL ENERGY COSTS $45,127
RECOMMENDED SAVINGS* $6,360 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $640
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees LPG Other Liquid (haz) Personnel Changes Administrative Changes Electricity Usage Electricity Demand Electricity Fees LPG Other Liquid (haz) Personnel Changes Administrative Changes
$ kWh $ kW-months/year $ $ $ MMBtu $ gal $ $ $ $
01: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$447
Cost:
$44
$292 9,379 $155 20 - - - - - - - - - - $292
9,379
kWh
$155
20
kW-months/year
-
-
$
-
-
MMBtu
-
-
gal
-
-
$
-
-
$
02: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$301
Cost:
$560
- - - - $301 - - - - - - - - - -
-
kWh
-
-
kW-months/year
$301
-
$
-
-
MMBtu
-
-
gal
-
-
$
-
-
$
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,046
Cost:
$8,012
- - $774 102 - - $1,272 140 - - - - - - -
-
kWh
$774
102
kW-months/year
-
-
$
$1,272
140
MMBtu
-
-
gal
-
-
$
-
-
$
04: 2.2442 PREHEAT COMBUSTION AIR WITH WASTE HEAT Savings:
$1,481
Cost:
$5,600
- - - - - - $1,481 252 - - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
$1,481
252
MMBtu
-
-
gal
-
-
$
-
-
$
05: 3.5113 SELL OIL TO RECYCLER Savings:
$412
Cost:
$320
- - - - - - - - $412 578 - - - - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
$412
578
gal
-
-
$
-
-
$
06: 4.441 INSTALL AUTOMATIC PACKING EQUIPMENT Savings:
$1,033
Cost:
$4,000
- - - - - - - - - - $1,033 - - - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
gal
$1,033
-
$
-
-
$
07: 4.821 PAY BILLS ON TIME TO AVOID LATE FEES Savings:
$640
Cost:
$(-1,560)
- - - - - - - - - - - - $640 - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
gal
-
-
$
$640
-
$
TOTAL RECOMMENDED Savings:
$6,360
Cost:
$16,976
$292 9,379 $929 122 $301 - $2,753 392 $412 578 $1,033 - $640 - $292
9,379
kWh
$929
122
kW-months/year
$301
-
$
$2,753
392
MMBtu
$412
578
gal
$1,033
-
$
$640
-
$
TOTAL IMPLEMENTED Savings:
$640
Cost:
$(-1,560)
- - - - - - - - - - - - $640 - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
gal
-
-
$
$640
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ MMBtu $ gal $ $ $ $
Electricity Usage Electricity Demand Electricity Fees LPG Other Liquid (haz) Personnel Changes Administrative Changes Electricity Usage Electricity Demand Electricity Fees LPG Other Liquid (haz) Personnel Changes Administrative Changes