Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | South Dakota State |
---|---|
Assessment Year | 2000 |
Principal Product | Non-Powered Material Handling Products |
NAICS | n/a |
SIC | 3400 - |
Sales | $5,000,000-$10,000,000 |
# of Employees | 70 |
Plant Area (Sq.Ft.) | 100,000 |
Annual Production | 10,000 Pieces |
Production Hrs. Annual | 2,600 |
Location (State) | SD |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $27,750 | 930,539 | kWh | $0.03 |
Electricity Demand | $10,565 | 3,708 | kW-months/year | $2.85 |
Natural Gas | $21,850 | 5,500 | MMBtu | $3.97 |
LPG | $1,647 | 379 | MMBtu | $4.35 |
TOTAL ENERGY COSTS | $57,349 | |||
RECOMMENDED SAVINGS* | $19,117 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $11,571 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Solid Waste (non-haz) | Solid Waste (haz) | Personnel Changes | Administrative Changes | Electricity Usage | Electricity Demand | Natural Gas | Solid Waste (non-haz) | Solid Waste (haz) | Personnel Changes | Administrative Changes | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | lb | $ | lb | $ | $ | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS |
Savings: $3,933 Cost: $564 |
- | - | - | - | $3,933 | 991 | - | - | - | - | - | - | - | - |
- - kWh |
- - kW-months/year |
$3,933 991 MMBtu |
- - lb |
- - lb |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT |
Savings: $1,164 Cost: $806 |
- | - | - | - | $1,164 | 524 | - | - | - | - | - | - | - | - |
- - kWh |
- - kW-months/year |
$1,164 524 MMBtu |
- - lb |
- - lb |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $466 Cost: $237 |
$237 | 10,551 | $229 | 49 | - | - | - | - | - | - | - | - | - | - |
$237 10,551 kWh |
$229 49 kW-months/year |
- - MMBtu |
- - lb |
- - lb |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.2515 USE OPTIMUM THICKNESS INSULATION |
Savings: $155 Cost: $478 |
- | - | - | - | $155 | 39 | - | - | - | - | - | - | - | - |
- - kWh |
- - kW-months/year |
$155 39 MMBtu |
- - lb |
- - lb |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.7135 INSTALL OCCUPANCY SENSORS |
Savings: $86 Cost: $108 |
$86 | 3,810 | - | - | - | - | - | - | - | - | - | - | - | - |
$86 3,810 kWh |
- - kW-months/year |
- - MMBtu |
- - lb |
- - lb |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $1,246 Cost: $4,062 |
$649 | 29,015 | $597 | 128 | - | - | - | - | - | - | - | - | - | - |
$649 29,015 kWh |
$597 128 kW-months/year |
- - MMBtu |
- - lb |
- - lb |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.7231 USE RADIANT HEATER FOR SPOT HEATING |
Savings: $3,234 Cost: $12,690 |
- | - | - | - | $3,234 | 815 | - | - | - | - | - | - | - | - |
- - kWh |
- - kW-months/year |
$3,234 815 MMBtu |
- - lb |
- - lb |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 3.6125 SELL COMBUSTIBLE WASTE |
Savings: $1,588 Cost: $6,250 |
- | - | - | - | - | - | $1,588 | 39,200 | - | - | - | - | - | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
$1,588 39,200 lb |
- - lb |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 3.6125 SELL COMBUSTIBLE WASTE |
Savings: $4,712 Cost: $934 |
- | - | - | - | - | - | - | - | $4,800 | 3,000 | - | - | $(-88) | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
- - lb |
$4,800 3,000 lb |
- - $ |
$(-88) - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
10: 4.441 INSTALL AUTOMATIC PACKING EQUIPMENT |
Savings: $2,533 Cost: $4,000 |
- | - | - | - | - | - | - | - | - | - | $2,533 | - | - | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
- - lb |
- - lb |
$2,533 - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $19,117 Cost: $30,129 |
$972 | 43,376 | $826 | 177 | $8,486 | 2,369 | $1,588 | 39,200 | $4,800 | 3,000 | $2,533 | - | $(-88) | - | $972 43,376 kWh |
$826 177 kW-months/year |
$8,486 2,369 MMBtu |
$1,588 39,200 lb |
$4,800 3,000 lb |
$2,533 - $ |
$(-88) - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $11,571 Cost: $18,883 |
$323 | 14,361 | $229 | 49 | $8,486 | 2,369 | - | - | - | - | $2,533 | - | - | - | $323 14,361 kWh |
$229 49 kW-months/year |
$8,486 2,369 MMBtu |
- - lb |
- - lb |
$2,533 - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | lb | $ | lb | $ | $ | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Solid Waste (non-haz) | Solid Waste (haz) | Personnel Changes | Administrative Changes | Electricity Usage | Electricity Demand | Natural Gas | Solid Waste (non-haz) | Solid Waste (haz) | Personnel Changes | Administrative Changes |