IAC logo
IAC Assessment: DS0164
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: DS0164
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center South Dakota State
Assessment Year 2000
Principal Product Non-Powered Material Handling Products
NAICS n/a
SIC 3400 -
Sales $5,000,000-$10,000,000
# of Employees 70
Plant Area (Sq.Ft.) 100,000
Annual Production 10,000 Pieces
Production Hrs. Annual 2,600
Location (State) SD
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $27,750 930,539 kWh $0.03
Electricity Demand $10,565 3,708 kW-months/year $2.85
Natural Gas $21,850 5,500 MMBtu $3.97
LPG $1,647 379 MMBtu $4.35
TOTAL ENERGY COSTS $57,349
RECOMMENDED SAVINGS* $19,117 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $11,571
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Solid Waste (haz) Personnel Changes Administrative Changes Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Solid Waste (haz) Personnel Changes Administrative Changes
$ kWh $ kW-months/year $ MMBtu $ lb $ lb $ $ $ $
01: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$3,933
Cost:
$564
- - - - $3,933 991 - - - - - - - - -
-
kWh
-
-
kW-months/year
$3,933
991
MMBtu
-
-
lb
-
-
lb
-
-
$
-
-
$
02: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$1,164
Cost:
$806
- - - - $1,164 524 - - - - - - - - -
-
kWh
-
-
kW-months/year
$1,164
524
MMBtu
-
-
lb
-
-
lb
-
-
$
-
-
$
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$466
Cost:
$237
$237 10,551 $229 49 - - - - - - - - - - $237
10,551
kWh
$229
49
kW-months/year
-
-
MMBtu
-
-
lb
-
-
lb
-
-
$
-
-
$
04: 2.2515 USE OPTIMUM THICKNESS INSULATION Savings:
$155
Cost:
$478
- - - - $155 39 - - - - - - - - -
-
kWh
-
-
kW-months/year
$155
39
MMBtu
-
-
lb
-
-
lb
-
-
$
-
-
$
05: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$86
Cost:
$108
$86 3,810 - - - - - - - - - - - - $86
3,810
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
-
-
lb
-
-
$
-
-
$
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,246
Cost:
$4,062
$649 29,015 $597 128 - - - - - - - - - - $649
29,015
kWh
$597
128
kW-months/year
-
-
MMBtu
-
-
lb
-
-
lb
-
-
$
-
-
$
07: 2.7231 USE RADIANT HEATER FOR SPOT HEATING Savings:
$3,234
Cost:
$12,690
- - - - $3,234 815 - - - - - - - - -
-
kWh
-
-
kW-months/year
$3,234
815
MMBtu
-
-
lb
-
-
lb
-
-
$
-
-
$
08: 3.6125 SELL COMBUSTIBLE WASTE Savings:
$1,588
Cost:
$6,250
- - - - - - $1,588 39,200 - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$1,588
39,200
lb
-
-
lb
-
-
$
-
-
$
09: 3.6125 SELL COMBUSTIBLE WASTE Savings:
$4,712
Cost:
$934
- - - - - - - - $4,800 3,000 - - $(-88) - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
$4,800
3,000
lb
-
-
$
$(-88)
-
$
10: 4.441 INSTALL AUTOMATIC PACKING EQUIPMENT Savings:
$2,533
Cost:
$4,000
- - - - - - - - - - $2,533 - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
-
-
lb
$2,533
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$19,117
Cost:
$30,129
$972 43,376 $826 177 $8,486 2,369 $1,588 39,200 $4,800 3,000 $2,533 - $(-88) - $972
43,376
kWh
$826
177
kW-months/year
$8,486
2,369
MMBtu
$1,588
39,200
lb
$4,800
3,000
lb
$2,533
-
$
$(-88)
-
$
TOTAL IMPLEMENTED Savings:
$11,571
Cost:
$18,883
$323 14,361 $229 49 $8,486 2,369 - - - - $2,533 - - - $323
14,361
kWh
$229
49
kW-months/year
$8,486
2,369
MMBtu
-
-
lb
-
-
lb
$2,533
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ lb $ lb $ $ $ $
Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Solid Waste (haz) Personnel Changes Administrative Changes Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Solid Waste (haz) Personnel Changes Administrative Changes