IAC Assessment: DS0166
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: DS0166
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center South Dakota State
Assessment Year 2000
Principal Product Hardwood Mouldings
NAICS n/a
SIC 2431 - Millwork
Sales $10,000,000-$50,000,000
# of Employees 200
Plant Area (Sq.Ft.) 198,000
Annual Production 21,500 Thousand Feet
Production Hrs. Annual 4,394
Location (State) MN
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $269,229 6,435,522 kWh $0.04
Electricity Demand $136,115 24,144 kW-months/year $5.64
Electricity Fees $1,285 - $ -
Natural Gas $11,579 2,380 MMBtu $4.87
LPG $8,024 1,333 MMBtu $6.02
TOTAL ENERGY COSTS $429,169
RECOMMENDED SAVINGS* $62,184 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $33,695
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Solid Waste (non-haz) Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Electricity Fees Solid Waste (non-haz) Personnel Changes Ancillary Material Cost
$ kWh $ kW-months/year $ $ $ lb $ $ $ $
01: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$1,974
Cost:
$251
$1,446 34,584 $528 94 - - - - - - - - $1,446
34,584
kWh
$528
94
kW-months/year
-
-
$
-
-
lb
-
-
$
-
-
$
02: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$1,511
Cost:
$500
$1,105 26,377 $406 72 - - - - - - - - $1,105
26,377
kWh
$406
72
kW-months/year
-
-
$
-
-
lb
-
-
$
-
-
$
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$5,561
Cost:
$21,339
$4,079 97,304 $1,482 263 - - - - - - - - $4,079
97,304
kWh
$1,482
263
kW-months/year
-
-
$
-
-
lb
-
-
$
-
-
$
04: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$970
Cost:
$648
$970 23,154 - - - - - - - - - - $970
23,154
kWh
-
-
kW-months/year
-
-
$
-
-
lb
-
-
$
-
-
$
05: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$2,134
Cost:
$1,750
- - - - $2,134 - - - - - - - -
-
kWh
-
-
kW-months/year
$2,134
-
$
-
-
lb
-
-
$
-
-
$
06: 4.611 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE Savings:
$688
Cost:
-
- - - - - - - - $688 - - - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
lb
$688
-
$
-
-
$
07: 4.652 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES Savings:
$1,174
Cost:
$4,000
- - - - - - - - $1,174 - - - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
lb
$1,174
-
$
-
-
$
08: 4.652 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES Savings:
$30,210
Cost:
$80,000
- - - - - - - - $30,210 - - - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
lb
$30,210
-
$
-
-
$
09: 3.5311 RECOVER AND REUSE WASTE MATERIAL Savings:
$1,440
Cost:
$1,175
- - - - - - $1,440 17,250 - - - - -
-
kWh
-
-
kW-months/year
-
-
$
$1,440
17,250
lb
-
-
$
-
-
$
10: 4.125 Savings:
$16,522
Cost:
$4,316
- - - - - - - - - - $16,522 - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
lb
-
-
$
$16,522
-
$
TOTAL RECOMMENDED Savings:
$62,184
Cost:
$113,979
$7,600 181,419 $2,416 429 $2,134 - $1,440 17,250 $32,072 - $16,522 - $7,600
181,419
kWh
$2,416
429
kW-months/year
$2,134
-
$
$1,440
17,250
lb
$32,072
-
$
$16,522
-
$
TOTAL IMPLEMENTED Savings:
$33,695
Cost:
$80,751
$2,551 60,961 $934 166 - - - - $30,210 - - - $2,551
60,961
kWh
$934
166
kW-months/year
-
-
$
-
-
lb
$30,210
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ lb $ $ $ $
Electricity Usage Electricity Demand Electricity Fees Solid Waste (non-haz) Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Electricity Fees Solid Waste (non-haz) Personnel Changes Ancillary Material Cost