IAC logo
IAC Assessment: DS0168
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: DS0168
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center South Dakota State
Assessment Year 2000
Principal Product Oriented Structural Board
NAICS n/a
SIC 2493 - Reconstituted Wood Products
Sales $10,000,000-$50,000,000
# of Employees 140
Plant Area (Sq.Ft.) 271,800
Annual Production 401,000 Thousand Feet
Production Hrs. Annual 8,472
Location (State) MN
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $1,104,646 43,451,642 kWh $0.03
Electricity Demand $593,940 66,288 kW-months/year $8.96
Electricity Fees $(-115,849) - $ -
Natural Gas $185,395 69,068 MMBtu $2.68
LPG $12,293 3,900 MMBtu $3.15
TOTAL ENERGY COSTS $1,781,359
RECOMMENDED SAVINGS* $40,858 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $7,986
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas LPG Electricity Usage Electricity Demand Natural Gas LPG
$ kWh $ kW-months/year $ MMBtu $ MMBtu
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$3,922
Cost:
$5,987
$2,331 93,200 $1,591 178 - - - - $2,331
93,200
kWh
$1,591
178
kW-months/year
-
-
MMBtu
-
-
MMBtu
02: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$1,741
Cost:
$2,484
$1,741 69,754 - - - - - - $1,741
69,754
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
MMBtu
03: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$22,182
Cost:
$53,350
$22,182 887,456 - - - - - - $22,182
887,456
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
MMBtu
04: 2.4324 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT Savings:
$871
Cost:
$511
$581 23,154 $290 32 - - - - $581
23,154
kWh
$290
32
kW-months/year
-
-
MMBtu
-
-
MMBtu
05: 2.4322 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES Savings:
$7,115
Cost:
$6,647
$2,868 114,889 $4,247 474 - - - - $2,868
114,889
kWh
$4,247
474
kW-months/year
-
-
MMBtu
-
-
MMBtu
06: 2.2426 USE WASTE HEAT FROM FLUE GASES TO HEAT SPACE CONDITIONING AIR Savings:
$5,027
Cost:
$18,608
$(-8) (-293) $(-667) (-74) $2,307 861 $3,395 1,077 $(-8)
(-293)
kWh
$(-667)
(-74)
kW-months/year
$2,307
861
MMBtu
$3,395
1,077
MMBtu
TOTAL RECOMMENDED Savings:
$40,858
Cost:
$87,587
$29,695 1,188,160 $5,461 610 $2,307 861 $3,395 1,077 $29,695
1,188,160
kWh
$5,461
610
kW-months/year
$2,307
861
MMBtu
$3,395
1,077
MMBtu
TOTAL IMPLEMENTED Savings:
$7,986
Cost:
$7,158
$3,449 138,043 $4,537 506 - - - - $3,449
138,043
kWh
$4,537
506
kW-months/year
-
-
MMBtu
-
-
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ MMBtu
Electricity Usage Electricity Demand Natural Gas LPG Electricity Usage Electricity Demand Natural Gas LPG