IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center South Dakota State
Assessment Year 2000
Principal Product Treated lumber
NAICS n/a
SIC 2499 - Wood Products, Nec
Sales $10,000,000-$50,000,000
# of Employees 40
Plant Area (Sq.Ft.) 62,460
Annual Production 27,942,000 Thousand Feet
Production Hrs. Annual 4,940
Location (State) SD
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $24,575 562,720 kWh $0.04
Electricity Demand $18,700 2,304 kW-months/year $8.12
Electricity Fees $1,732 - $ -
Natural Gas $7,630 1,623 MMBtu $4.70
LPG $3,759 184 MMBtu $20.43
TOTAL ENERGY COSTS $(-18,144)
RECOMMENDED SAVINGS* $48,504 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $2,008
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Solid Waste (non-haz) Personnel Changes Ancillary Material Cost By-product Production Electricity Usage Electricity Demand Solid Waste (non-haz) Personnel Changes Ancillary Material Cost By-product Production
$ kWh $ kW-months/year $ lb $ $ $ $ $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$274
Cost:
$723
$147 3,224 $127 16 - - - - - - - - $147
3,224
kWh
$127
16
kW-months/year
-
-
lb
-
-
$
-
-
$
-
-
$
02: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$120
Cost:
$324
$120 2,638 - - - - - - - - - - $120
2,638
kWh
-
-
kW-months/year
-
-
lb
-
-
$
-
-
$
-
-
$
03: 2.4324 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT Savings:
$640
Cost:
$515
$377 8,499 $263 32 - - - - - - - - $377
8,499
kWh
$263
32
kW-months/year
-
-
lb
-
-
$
-
-
$
-
-
$
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$589
Cost:
$224
$404 9,086 $185 23 - - - - - - - - $404
9,086
kWh
$185
23
kW-months/year
-
-
lb
-
-
$
-
-
$
-
-
$
05: 3.5313 INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE Savings:
$1,419
Cost:
$45
- - - - $590 25,110 $390 - - - $439 - -
-
kWh
-
-
kW-months/year
$590
25,110
lb
$390
-
$
-
-
$
$439
-
$
06: 3.5212 REGRIND, REUSE, OR SELL SCRAP PLASTIC PARTS Savings:
$2,360
Cost:
$3,145
- - - - $2,360 100,400 - - - - - - -
-
kWh
-
-
kW-months/year
$2,360
100,400
lb
-
-
$
-
-
$
-
-
$
07: 4.514 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE HANDLING COSTS Savings:
$26,520
Cost:
$2,940
- - - - - - $26,520 - - - - - -
-
kWh
-
-
kW-months/year
-
-
lb
$26,520
-
$
-
-
$
-
-
$
08: 4.211 CONSIDER USE / PURCHASE OF BULK MATERIALS WHERE POSSIBLE Savings:
$1,980
Cost:
$1,350
- - - - - - - - $1,980 - - - -
-
kWh
-
-
kW-months/year
-
-
lb
-
-
$
$1,980
-
$
-
-
$
09: 4.441 INSTALL AUTOMATIC PACKING EQUIPMENT Savings:
$5,407
Cost:
$3,500
- - - - - - $5,407 - - - - - -
-
kWh
-
-
kW-months/year
-
-
lb
$5,407
-
$
-
-
$
-
-
$
10: 4.131 MODIFY PROCESS TO REDUCE MATERIAL USE/COST Savings:
$9,195
Cost:
$2,627
- - - - - - - - $9,195 - - - -
-
kWh
-
-
kW-months/year
-
-
lb
-
-
$
$9,195
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$48,504
Cost:
$15,393
$1,048 23,447 $575 71 $2,950 125,510 $32,317 - $11,175 - $439 - $1,048
23,447
kWh
$575
71
kW-months/year
$2,950
125,510
lb
$32,317
-
$
$11,175
-
$
$439
-
$
TOTAL IMPLEMENTED Savings:
$2,008
Cost:
$269
$404 9,086 $185 23 $590 25,110 $390 - - - $439 - $404
9,086
kWh
$185
23
kW-months/year
$590
25,110
lb
$390
-
$
-
-
$
$439
-
$
Savings
Cost
$ kWh $ kW-months/year $ lb $ $ $ $ $ $
Electricity Usage Electricity Demand Solid Waste (non-haz) Personnel Changes Ancillary Material Cost By-product Production Electricity Usage Electricity Demand Solid Waste (non-haz) Personnel Changes Ancillary Material Cost By-product Production