IAC logo
IAC Assessment: DS0172
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: DS0172
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center South Dakota State
Assessment Year 2000
Principal Product Fire and Gas Detection Products
NAICS n/a
SIC 3669 - Communications Equipment, Nec
Sales $50,000,000-$100,000,000
# of Employees 225
Plant Area (Sq.Ft.) 100,000
Annual Production 45,000 Pieces
Production Hrs. Annual 4,576
Location (State) MN
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $113,633 3,102,579 kWh $0.04
Electricity Demand $54,834 7,164 kW-months/year $7.65
Electricity Fees $18,044 - $ -
Natural Gas $24,349 4,972 MMBtu $4.90
LPG $576 45 MMBtu $12.80
TOTAL ENERGY COSTS $215,227
RECOMMENDED SAVINGS* $17,279 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $10,771
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Personnel Changes Administrative Changes Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Personnel Changes Administrative Changes
$ kWh $ kW-months/year $ MMBtu $ lb $ $ $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$7,907
Cost:
$8,927
$5,382 145,662 $2,525 330 - - - - - - - - $5,382
145,662
kWh
$2,525
330
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
02: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$569
Cost:
$864
$569 15,240 - - - - - - - - - - $569
15,240
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
03: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$1,033
Cost:
$2,718
$1,033 27,843 - - - - - - - - - - $1,033
27,843
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
04: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$721
Cost:
$1,770
- - - - $721 147 - - - - - - -
-
kWh
-
-
kW-months/year
$721
147
MMBtu
-
-
lb
-
-
$
-
-
$
05: 3.5315 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER Savings:
$1,262
Cost:
$4,230
- - - - - - $1,262 29,200 - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$1,262
29,200
lb
-
-
$
-
-
$
06: 4.4450 INSTALL EQUIPMENT TO MOVE PRODUCT Savings:
$1,287
Cost:
$450
- - - - - - - - $1,287 - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
$1,287
-
$
-
-
$
07: 4.5150 INSTALL SHELVES / RACKS TO UTILIZE UNUSED SPACE Savings:
$4,500
Cost:
$17,260
- - - - - - - - - - $4,500 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
$4,500
-
$
TOTAL RECOMMENDED Savings:
$17,279
Cost:
$36,219
$6,984 188,745 $2,525 330 $721 147 $1,262 29,200 $1,287 - $4,500 - $6,984
188,745
kWh
$2,525
330
kW-months/year
$721
147
MMBtu
$1,262
29,200
lb
$1,287
-
$
$4,500
-
$
TOTAL IMPLEMENTED Savings:
$10,771
Cost:
$16,739
$6,984 188,745 $2,525 330 - - $1,262 29,200 - - - - $6,984
188,745
kWh
$2,525
330
kW-months/year
-
-
MMBtu
$1,262
29,200
lb
-
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ lb $ $ $ $
Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Personnel Changes Administrative Changes Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Personnel Changes Administrative Changes