IAC Assessment: GT0236
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: GT0236
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Georgia Institute of Technology
Assessment Year 1984
Principal Product CORRUGATED PAPER BOARD
NAICS n/a
SIC 2653 - Corrugated And Solid Fiber Boxes
Sales $5,000,000-$10,000,000
# of Employees 60
Plant Area (Sq.Ft.) 0
Annual Production 250,000 Thousand Feet
Production Hrs. Annual 3,000
Location (State) GA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $135,632 2,456,038 kWh $0.06
Natural Gas $91,202 16,725 MMBtu $5.45
LPG $10,046 1,145 MMBtu $8.77
TOTAL ENERGY COSTS $236,880
RECOMMENDED SAVINGS* $7,659 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $2,529
#|Description Savings
Cost
Status Electricity Usage Natural Gas Electricity Usage Natural Gas
$ kWh $ MMBtu
01: 2.7221 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA Savings:
$49
Cost:
-
$49 879 - - $49
879
kWh
-
-
MMBtu
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,120
Cost:
$50
$1,120 20,223 - - $1,120
20,223
kWh
-
-
MMBtu
03: 2.6212 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME Savings:
$1,182
Cost:
-
$1,182 21,395 - - $1,182
21,395
kWh
-
-
MMBtu
04: 2.6212 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME Savings:
$1,004
Cost:
-
$1,004 18,171 - - $1,004
18,171
kWh
-
-
MMBtu
05: 2.1243 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER Savings:
$2,625
Cost:
$5,000
- - $2,625 496 -
-
kWh
$2,625
496
MMBtu
06: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$356
Cost:
$546
$356 6,448 - - $356
6,448
kWh
-
-
MMBtu
07: 2.6212 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME Savings:
$1,323
Cost:
$2,000
- - $1,323 250 -
-
kWh
$1,323
250
MMBtu
TOTAL RECOMMENDED Savings:
$7,659
Cost:
$7,596
$3,711 67,116 $3,948 746 $3,711
67,116
kWh
$3,948
746
MMBtu
TOTAL IMPLEMENTED Savings:
$2,529
Cost:
$596
$2,529 45,721 - - $2,529
45,721
kWh
-
-
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage Natural Gas Electricity Usage Natural Gas