IAC logo
IAC Assessment: GT0263
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: GT0263
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Georgia Institute of Technology
Assessment Year 1985
Principal Product FIRE HYDRANTS & VALVES
NAICS n/a
SIC 3494 - Valves And Pipe Fittings, Nec
Sales $10,000,000-$50,000,000
# of Employees 375
Plant Area (Sq.Ft.) 0
Annual Production 11,000 Tons
Production Hrs. Annual 4,000
Location (State) AL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $1,346,817 32,358,148 kWh $0.04
Natural Gas $398,995 78,625 MMBtu $5.07
TOTAL ENERGY COSTS $1,745,812
RECOMMENDED SAVINGS* $85,321 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $80,787
#|Description Savings
Cost
Status Electricity Usage Natural Gas Electricity Usage Natural Gas
$ kWh $ MMBtu
01: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$58,700
Cost:
$82,000
- - $58,700 11,900 -
-
kWh
$58,700
11,900
MMBtu
02: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$1,934
Cost:
$75
$1,934 46,600 - - $1,934
46,600
kWh
-
-
MMBtu
03: 2.2443 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR Savings:
$1,500
Cost:
$3,000
- - $1,500 305 -
-
kWh
$1,500
305
MMBtu
04: 2.2514 COVER OPEN TANKS Savings:
$1,100
Cost:
$320
$1,100 26,377 - - $1,100
26,377
kWh
-
-
MMBtu
05: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$787
Cost:
$3,679
$787 19,050 - - $787
19,050
kWh
-
-
MMBtu
06: 2.1122 RE-SIZE CHARGING OPENINGS OR ADD A MOVABLE DOOR ON EQUIPMENT Savings:
$21,300
Cost:
$400
$21,300 512,016 - - $21,300
512,016
kWh
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$85,321
Cost:
$89,474
$25,121 604,043 $60,200 12,205 $25,121
604,043
kWh
$60,200
12,205
MMBtu
TOTAL IMPLEMENTED Savings:
$80,787
Cost:
$86,079
$22,087 531,066 $58,700 11,900 $22,087
531,066
kWh
$58,700
11,900
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage Natural Gas Electricity Usage Natural Gas