IAC logo
IAC Assessment: GT0290
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: GT0290
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Georgia Institute of Technology
Assessment Year 1986
Principal Product ELECTRIC METERS
NAICS n/a
SIC 3825 - Instruments To Measure Electricity
Sales $10,000,000-$50,000,000
# of Employees 300
Plant Area (Sq.Ft.) 0
Annual Production 100,000 Pieces
Production Hrs. Annual 2,080
Location (State) GA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $116,488 1,490,914 kWh $0.08
Natural Gas $3,918 635 MMBtu $6.17
TOTAL ENERGY COSTS $120,406
RECOMMENDED SAVINGS* $9,619 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $9,619
#|Description Savings
Cost
Status Electricity Usage Electricity Usage
$ kWh
01: 2.3191 USE DEMAND CONTROLLER OR LOAD SHEDDER Savings:
$8,798
Cost:
$12,000
$8,798 - $8,798
-
kWh
02: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$636
Cost:
-
$636 8,206 $636
8,206
kWh
03: 2.4312 IMPROVE LUBRICATION PRACTICES Savings:
$185
Cost:
$64
$185 2,345 $185
2,345
kWh
TOTAL RECOMMENDED Savings:
$9,619
Cost:
$12,064
$9,619 10,551 $9,619
10,551
kWh
TOTAL IMPLEMENTED Savings:
$9,619
Cost:
$12,064
$9,619 10,551 $9,619
10,551
kWh
Savings
Cost
$ kWh
Electricity Usage Electricity Usage