Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Georgia Institute of Technology
Assessment Year 1987
Principal Product METAL CABINETS& DISPLAYS
NAICS n/a
SIC 3443 - Fabricated Plate Work (boiler Shops)
Sales $5,000,000-$10,000,000
# of Employees 120
Plant Area (Sq.Ft.) 0
Annual Production 0 Units
Production Hrs. Annual 2,000
Location (State) AL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $79,941 1,337,046 kWh $0.06
Natural Gas $30,095 9,253 MMBtu $3.25
TOTAL ENERGY COSTS $110,036
RECOMMENDED SAVINGS* $9,404 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $4,622
#|Description Savings
Cost
Status Electricity Usage Natural Gas Electricity Usage Natural Gas
$ kWh $ MMBtu
01: 2.7123 KEEP LAMPS AND REFLECTORS CLEAN Savings:
$1,390
Cost:
$1,577
$1,390 24,033 - - $1,390
24,033
kWh
-
-
MMBtu
02: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$92
Cost:
$40
$92 1,465 - - $92
1,465
kWh
-
-
MMBtu
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,700
Cost:
$1,050
$1,700 29,308 - - $1,700
29,308
kWh
-
-
MMBtu
04: 2.2422 USE WASTE HEAT FROM HOT FLUE GASES TO GENERATE STEAM Savings:
$458
Cost:
$3,000
- - $458 145 -
-
kWh
$458
145
MMBtu
05: 2.2531 RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR Savings:
$1,320
Cost:
$480
- - $1,320 417 -
-
kWh
$1,320
417
MMBtu
06: 2.2531 RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR Savings:
$1,440
Cost:
$500
- - $1,440 456 -
-
kWh
$1,440
456
MMBtu
07: 2.8114 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE Savings:
$3,004
Cost:
$5,000
$3,004 - - - $3,004
-
kWh
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$9,404
Cost:
$11,647
$6,186 54,806 $3,218 1,018 $6,186
54,806
kWh
$3,218
1,018
MMBtu
TOTAL IMPLEMENTED Savings:
$4,622
Cost:
$3,167
$3,182 54,806 $1,440 456 $3,182
54,806
kWh
$1,440
456
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage Natural Gas Electricity Usage Natural Gas